Currently, there is no direct link to a full video of prefabricated house installation, but the installation process can be described based on relevant textual descriptions.

Full Process of Lifting Bay Windows and Balconies in Prefabricated Buildings

In prefabricated buildings, the lifting of bay windows and balconies is a crucial step. First, conduct a comprehensive inspection of the lifting equipment to ensure its good performance and safety. Then, determine the precise positions of the bay windows and balconies according to the design drawings and mark them on the main building structure. Next, use a crane to slowly lift the prefabricated bay windows and balconies, maintaining stability during the lifting process to avoid collisions. When approaching the installation positions, professional personnel make fine adjustments to ensure accurate alignment between the bay windows/balconies and the main structure. After alignment, use bolts and other connectors to secure them, ensuring stability. Finally, seal the connection areas to prevent rainwater leakage.

Installation Process of Single-Story Prefabricated Modular Houses

The installation of single-story prefabricated modular houses is relatively straightforward. First, level the site and construct the foundation to ensure it is firm and level. Then, transport the prefabricated house modules to the installation site and use a crane to lift each module in sequence. During the lifting process, pay attention to the order and orientation of the modules, assembling them according to the design requirements. After the modules are in place, use connectors to firmly connect adjacent modules, forming an integrated structure. Next, install doors, windows, and other components, ensuring they open smoothly and seal well. Finally, carry out decoration work on the roof and walls to complete the house installation.

Full Process of Building Prefabricated Residential Houses

The first step is to build the chassis frame of the house. Conduct precise measurements and positioning according to the design dimensions, and use materials such as steel or concrete to construct a sturdy chassis frame. Then, lay the floor joists to provide stable support for the floor. When installing wall modules, ensure tight splicing between the modules and use special adhesives or connectors for fixation. When building the partition wall framework, pay attention to the position and dimensions of the partition walls to ensure they meet the design requirements. When laying the second-floor floor beams, ensure their levelness and load-bearing capacity. Finally, construct the roof, selecting appropriate materials and construction methods according to the roof form to ensure its waterproofing and thermal insulation performance.