Quay lại blog
Bài viết

Images of Grouting Sleeves for Prefabricated Houses

Quản trị 18 tháng 9, 2026

Currently, images of grouting sleeves for prefabricated houses cannot be provided directly, but their structure, types, and working principles can be introduced in detail.

Grouting sleeves are key components used for steel bar connections in prefabricated buildings. They are assembled from metal sleeves, special grouting materials, and ribbed steel bars. Their core function is to achieve reliable connections between steel bars through the dual effects of mechanical interlocking and chemical bonding, ensuring the overall structural integrity.

They can be classified into two types based on the connection method:

  1. Semi-grouting sleeves: The inner side of the upper part of the sleeve is threaded, and the connecting steel bars need to be threaded in advance. During installation, the steel bars and the sleeve are mechanically connected through threads, and then the lower gap is filled with grouting material. This design combines the convenience of mechanical connections with the sealing properties of grouted connections, making it suitable for steel bar connections in vertical members (such as wall columns).
  2. Full-grouting sleeves: Both ends of the sleeve have no mechanical connection structures. The connecting steel bars are directly inserted into the sleeve, and then special grouting material is injected through the grout injection holes. After the grouting material hardens, it creates mechanical interlocking with the ribs of the steel bars and fills the gaps between the sleeve and the steel bars, forming an integral whole. Full-grouting sleeves offer more flexible construction but require strict control over the grouting quality.

Application in prefabricated wall-column joints: When prefabricating wall columns in factories, multiple steel bar sleeves are embedded in the upper members. During construction, the steel bars extending from the lower members are inserted into the reserved sleeves in the upper members to form anchorage. Subsequently, grouting material is injected through the grout injection ports to fill the gaps between the sleeves and the steel bars, ensuring a dense connection. This process requires the use of pressure grouting equipment and control over the fluidity and hardening time of the grouting material to avoid voids or segregation.

Key technical requirements:

  • The sleeve material must meet high-strength and corrosion-resistant requirements, typically using high-quality carbon structural steel or alloy steel.
  • The grouting material must possess high fluidity, early strength, high strength, and slight expansion properties to fill fine gaps and compensate for shrinkage.
  • During construction, the relative positions of the steel bars and the sleeves must be strictly positioned to ensure connection accuracy.

If you need an intuitive understanding of the appearance and structure of grouting sleeves, it is recommended to consult the "Technical Specification for Prefabricated Concrete Structures" or relevant atlases, or contact professional manufacturers to obtain product samples.