The prefabricated house customization process mainly includes three key stages: site selection and design, material preparation and production, and transportation, installation, and acceptance.

Site Selection and Design: This is the starting point of the customization process. First, select an appropriate construction site, comprehensively evaluating factors such as the surrounding environment and geological conditions to ensure the safety and stability of the house construction. Then, design the house blueprint according to user needs, dividing the house into independent modules such as bedrooms, kitchens and bathrooms, and corridors. After that, formulate detailed design plans and production schedules based on the divided modules. This process usually requires collaboration with professional architectural design teams or companies, leveraging their expertise and experience to ensure the rationality and practicality of the design, meeting users' requirements for house functionality, appearance, and other aspects.

Material Preparation and Production: After completing the design, prepare sufficient materials such as cement and steel bars. Subsequently, mass-produce modular components in the factory according to the design plans. During production, strictly control quality to ensure that all components meet quality standards and have accurate dimensions. At the same time, implement proper maintenance measures for the components to ensure the best product quality. Taking Chinese prefabricated houses as an example, the entire house is divided into independent standard modules. For instance, a bedroom and a set of kitchen and bathroom facilities are each made into standardized box modules. All processes are completed in domestic factories, including welding of the steel structure main body, wall laying, and pre-embedding of water and electricity pipelines. When leaving the factory, each module is a fully furnished room with decoration, water and electricity, and supporting facilities.

Transportation, Installation, and Acceptance: Transport the prefabricated house components to the construction site and carry out the installation of the main structure and supporting ancillary facilities (such as electrical systems and plumbing systems) according to the design drawings and construction plans. Taking the transportation and installation process of Chinese prefabricated houses as an example, first, customize the house layout according to overseas customers' needs. The factory mass-produces the modules and conducts unified coding and classification acceptance, implementing protective measures suitable for ocean shipping environments. Then, the finished modules are transferred to domestic ports via special flatbed trucks and loaded into international standard shipping containers. Next, the packaged house modules are shipped to various parts of the world on ocean-going freighters. Finally, after arriving at overseas ports, the modules are transported to the construction site and assembled like building blocks, with operations such as lifting, interface connection, and water and electricity connection. During installation, strengthen safety management, and conduct corresponding inspections and acceptances at each stage. Only after passing the inspections can the next process proceed until the entire construction project is completed.