Prefabricated House Construction Process Video

Quản trị 18 tháng 9, 2026

Currently, there is no direct link to a video on the construction process of prefabricated houses, but you can refer to the following detailed textual description of the process:

Phase 1: Leveling the Foundation and Pouring the Sub-base Layer First, the construction site needs to be cleared. Use an excavator to remove weeds, stones, and other debris to ensure the foundation surface is level. Surveyors must accurately measure the excavation depth and ground height to ensure compliance with the design drawings. Typically, excavation needs to go down about 60 centimeters. Then, lay down white plastic sheeting, which serves to prevent water loss during concrete pouring, promote hydration reactions, and thereby enhance the strength and durability of the concrete. Finally, use a concrete pump truck to pour the concrete into the designated area, forming the foundation sub-base layer. No steel reinforcement is used in this phase; it mainly relies on the strength of the concrete itself.

Phase 2: Installing Foundation Piles and Assembling Crossbeams After the concrete sub-base layer has solidified, install footplates to secure the foundation piles. First, use a drill to create holes in the sub-base layer and firmly fix the footplates with expansion screws. Then, use a mobile crane to lift and install the prefabricated foundation piles, each weighing about 5 tons, with reserved holes at the four corners for lifting. Once the foundation piles are in place, assemble the crossbeams like building blocks and adjust their positions using level measurements to ensure the structure is level. The connections between the crossbeams and foundation piles are secured with nuts, the gaps are filled with expanding foam, and the nut connections are sealed with cement to prevent water penetration.

Phase 3: Backfilling Soil and Pouring the Foundation After the foundation framework is complete, backfill soil to the specified height. If a second-floor structure is involved, lift and install factory-prefabricated load-bearing columns and crossbeams, connecting them through protrusions and recesses and securing them tightly with nuts. Once the second-floor framework is formed, lay a 5-centimeter-thick floor slab, pressing both ends onto the crossbeams by about 5 centimeters, and seal the gaps with expanding foam. The connections between the load-bearing columns require secondary grouting to enhance structural stability. Additionally, when lifting foundation piles and backfilling soil after the sub-base layer has solidified, lay a 10-centimeter-thick giant foam board to provide thermal insulation and moisture resistance. Finally, lay a threaded steel reinforcement mesh over the entire foundation framework. Workers screw the steel bars into the reserved threaded holes and use binding machines to secure all nodes, forming an integrated steel reinforcement skeleton. Then, pour concrete to complete the foundation construction.