Quay lại blog
Bài viết

Images of the Entire Prefabricated House Construction Process

Quản trị 18 tháng 9, 2026

Currently, there are no images of the entire prefabricated house construction process, but the construction process of prefabricated houses typically includes the following key steps:

The construction processes of different types of prefabricated houses vary. Here are the construction procedures for several common types of prefabricated houses.

Huacheng Cement Houses: The entire construction process adopts high-standard reinforced concrete one-time pouring and forming. This construction method means that in the factory, steel bars are reasonably arranged according to design requirements, and then the entire house structure is formed at once through concrete pouring. This process can ensure the integrity and stability of the house structure, reduce the complexity and uncertainty of on-site construction, and improve construction efficiency and quality. One-time pouring and forming also helps enhance the seismic performance and durability of the house, providing a safer and more reliable living environment for occupants.

E-MIC Prefabricated Concrete Box House System: The construction process of this system fully reflects the characteristics of modern architecture. First, tasks such as component splitting, pipeline layout, and unit combination simulation are completed on the computer, moving a large amount of traditional work to the factory in advance for standardized and integrated production. After the front-end factory completes the construction, the basic building units are transformed into three types: prefabricated concrete modules, prefabricated beams, and prefabricated slabs. During on-site construction, the building only needs to be quickly assembled, just like putting together house modules. This construction method significantly shortens the on-site construction period, reduces the workload and difficulty of on-site operations, and ensures the quality and precision of the house due to the standardization of factory production.

South Korean Rural Prefabricated Houses: The first step in self-building a house is to level the foundation and pour the cushion layer. First, clear the weeds and level the foundation, excavate the foundation pit, lay white plastic sheeting, and then pour the foundation. The second step is to install foundation piles and assemble the crossbeams. Install the foundation plates, use a mobile crane to install the foundation piles, assemble the crossbeams like building blocks, measure and adjust horizontally, then fix them with nuts, fill the gaps with expanding foam, and seal the nut fixation points with cement. The third step is to backfill the soil and pour the foundation. After the foundation frame structure is completed, backfill the soil. This construction method focuses on foundation treatment, providing a solid foundation for the stability of the house.