Construction Process of Prefabricated Houses

Quản trị 18 tháng 9, 2026

The construction process of prefabricated houses mainly includes five core steps: foundation treatment, installation of foundation piles and beams, production and transportation of modular components, on-site assembly, and gap treatment and acceptance, as follows:

Foundation treatment is the foundational step in construction. First, the site must be leveled, debris cleared, and the soil compacted. Then, a concrete cushion is poured as the base layer. Next, foundation pits are excavated to the designed depth, and white plastic sheeting is laid at the bottom of the pits to prevent moisture loss from the concrete. Finally, concrete is poured to form an integrated foundation. This step requires strict control over the concrete mix ratio and pouring thickness to ensure the foundation's bearing capacity meets design requirements and provides stable support for subsequent construction.

Installation of foundation piles and beams is carried out after the concrete has fully set. First, anchor plates are installed as fixed bases. Then, prefabricated heavy-duty foundation piles (each weighing approximately 5 tons) are lifted into place using a crane and secured with bolts through reserved holes in the anchor plates. Subsequently, beams are assembled, adjusted to the designed elevation using a level, and fastened with nuts. Gaps are filled with expanding foam to prevent water infiltration, and the surface is sealed with cement to ensure structural tightness and durability.

Production and transportation of modular components are completed in factories, representing a core advantage of prefabricated houses. Building modules (such as ceilings, walls, and floors) are produced through industrial assembly lines, integrating systems like electrical and plumbing lines and insulation layers. Each module is labeled with project name, model, production date, and other information for traceability. After production, they are secured with specialized transport frames to prevent deformation during transportation and ensure they arrive at the construction site intact.

On-site assembly relies on equipment like tower cranes to quickly assemble modules according to design drawings. Modules are connected mechanically (e.g., with bolts) or through cast-in-place concrete joints to form an integrated structure. Assembly typically proceeds from the ground floor upward, with附属 (ancillary) components like doors, windows, and stairs installed simultaneously. This phase features a short construction period (e.g., completing the main structure in 14-15 days) and significantly reduces on-site wet work, lowering dust and noise pollution.

Gap treatment and acceptance are the final quality assurance steps. All module joints are filled with high-strength grout to ensure structural integrity; electrical and plumbing connections undergo sealing tests to prevent leaks. After completion, the supervising unit conducts acceptance checks according to design specifications, examining structural safety, functional completeness, and appearance quality. Only after passing inspection can the house be delivered for use.

This process, through the "factory prefabrication + on-site assembly" model, achieves a dual improvement in construction efficiency and environmental friendliness, representing a typical application of modern construction industrialization.