The prefabricated house assembly construction process mainly includes four stages: preliminary preparation, foundation construction, component hoisting and assembly, and subsequent construction, as follows:

Preliminary preparation is the foundation of the entire construction process, encompassing three aspects: drawing deepening and component breakdown, factory prefabrication and quality inspection, and on-site layout. First, using BIM technology, a three-dimensional model is created based on the design drawings, breaking down the building into standardized prefabricated components such as exterior wall panels, interior wall panels, composite floor slabs, stairs, beams, and columns. The dimensions, specifications, and embedded positions of each component are clearly defined, and collision detection is carried out to avoid conflicts during subsequent construction. Next, the broken-down component drawings are sent to a professional prefabrication factory, which uses automated equipment for steel bar processing, formwork support, concrete pouring, and curing. Before leaving the factory, each component undergoes six inspections, including appearance, strength, and embedded parts, and is labeled with a QR code identity file for traceability. Finally, the transportation routes and stacking sites for the components are planned in advance. The site should be leveled and compacted, with components stacked according to the 'three zones, two lines' principle. Wall panels are stored vertically, floor slabs are stacked no more than six layers high, with 30 cm high sleepers at the bottom and covered with waterproof cloth. Meanwhile, hoisting equipment such as tower cranes is installed and debugged, and a measurement control network with millimeter-level precision is established.

During the foundation construction stage, the foundation construction of prefabricated buildings is generally similar to that of traditional cast-in-place foundations, but the emphasis is on the 'precise positioning of embedded parts'. Since subsequent prefabricated components are connected through embedded parts, their positions must be accurate; otherwise, it will affect the structural safety and quality of the entire building.

Component hoisting and assembly is the core stage. Taking a prefabricated frame structure as an example, after the construction of the first floor is completed, the columns of the next floor are hoisted first, followed by the main beams, secondary beams, and floor slabs. After the prefabricated components are hoisted, the reinforcement bars at the connection points are tied, and finally, the joints and the cast-in-place layer of the beams and slabs are poured. During the hoisting process, if the top (surface) of the component is not level when it is lifted off the ground, it must be adjusted to a level position before being hoisted to the installation location. This facilitates the alignment of reinforcement bars and the placement of components, ensuring the accuracy and safety of the construction.

In the subsequent construction stage, after the hoisting and assembly of the components are completed, necessary connection and finishing work are carried out, such as the overlapping and pouring of reinforced concrete, to ensure the stability and integrity of the entire building structure.