Prefabricated Concrete House Construction

Quản trị 18 tháng 9, 2026

Prefabricated concrete house construction is accomplished through the industrial production of building components and their on-site assembly. Its core processes include component production, on-site assembly, and foundation treatment, offering advantages such as short construction periods, low costs, and environmental friendliness.

Component production is the foundational step in prefabricated house construction. Main structural components of the house, such as floor slabs, beams, walls, and columns, are pre-cast in factories. During production, workers use molds to bind steel bars into a mesh framework and place connectors to enhance tensile strength and facilitate subsequent lifting. After concrete filling, vibration is applied to remove air bubbles and ensure component density. After surface leveling, plastic sheds are covered and heating is applied to promote cement hydration reactions, thereby improving component quality.

On-site assembly is a crucial step in prefabricated house construction. After components are transported to the construction site, they are assembled using bolt connectors, steel bar sleeve grouting, or prestressed technology. Prefabricated floor slabs, beams, walls, and other components are connected like building blocks to form the structure of a rough-finished house. Connection technologies are divided into two types: wet connections and dry connections. Wet connections, such as sleeves and grout anchors, achieve firm connections between components through concrete or grouting materials; dry connections, such as embedded connectors and prestressed connections, achieve component splicing through mechanical means. Among them, prestressed technology can significantly enhance the seismic resistance of the house.

Foundation treatment, similar to traditional house construction, is an important prerequisite for prefabricated house construction. Workers first dig a pit approximately 1 meter deep, lay a moisture-proof PE film, and pour waste concrete as the base. After solidification, guide steel plates are installed to position prefabricated concrete piles, ensuring the stability of the house foundation.

Prefabricated concrete house construction technology offers significant advantages. Through the standardized production and assembly of components, construction periods can be significantly shortened, with a two-story rough-finished house taking only about two weeks to complete. At the same time, this technology reduces costs and minimizes construction waste, with industrial bases in Fujian Province achieving a waste reduction of over 70%. Additionally, this technology is applicable to various building forms, such as frame structures and shear wall structures, and has broad application prospects.