Quay lại blog
Bài viết

Price Range of Prefabricated Assembly Houses

Quản trị 18 tháng 9, 2026

The price range of prefabricated assembly houses varies significantly due to differences in type, supplier, and specific configurations, with a wide overall price range and the need to consider additional costs such as transportation and foundation work. Here is a detailed analysis:

1. Price ranges for different types of houses
The price range for light steel integrated house villas is substantial, ranging from ¥3.0 to ¥2850.0 per square meter. This difference primarily stems from variations in material quality, design complexity, and supporting facilities. For example, a basic model may only include the main structure, while a high-end model may integrate decoration, intelligent systems, and energy-saving technologies, leading to a significant price increase.
The price range for modular prefabricated houses is even broader, spanning from ¥112.1 to ¥97750.0 per square meter. These houses are typically produced in “modules,” and price fluctuations are related to module functionality, materials, and customization levels. For instance, standard office modules may be priced lower, while special-function modules such as medical or laboratory units, which need to meet strict regulations, incur significantly higher costs.

2. Potential factors affecting prices
In addition to house type, the brand positioning, technical capabilities, and service abilities of suppliers also influence pricing. Well-known enterprises may charge a premium for quality assurance and after-sales service, while small and medium-sized suppliers may offer more competitive prices through cost control. Furthermore, the scale, number of floors, and design complexity of the house (such as irregular structures or large-span spaces) directly increase material and construction costs, thereby pushing up the total price.

3. Necessity of additional costs
The construction cost of prefabricated houses typically does not include transportation, foundation treatment, and concealed work expenses. Transportation costs are related to the volume, weight, and distance of the house and may account for 5%-15% of the total cost. Foundation costs depend on geological conditions, with soft soil foundations requiring additional reinforcement and potentially incurring higher costs than ordinary foundations. Concealed work (such as the pre-embedding of water and electricity pipelines and insulation layer construction) needs to match the house modules, and improper design may lead to rework, further increasing expenses.

Summary: When choosing a prefabricated assembly house, it is essential to clarify the required type (such as residential, office, or special-function), compare supplier quotes, and set aside 10%-20% of the budget for additional costs. It is recommended to prioritize suppliers offering “turnkey” services to reduce post-construction coordination costs.