New Style Container House Installation Diagram

Quản trị 15 tháng 9, 2026

The installation of new-style container houses mainly includes steps such as base frame installation, wall installation, floor laying, and overall fixation. The installation steps vary for different types of container houses.

Installation Steps for Assembled Container Houses

  1. Base Frame Installation: On a flat ground or workbench, connect the bottom corners of the container to the base beams using hexagon socket bolts, but do not tighten them yet. After adjusting to ensure that the diagonal difference of the base frame is ≤3mm, tighten the bolts.
  2. Secondary Beam Installation: Install π-shaped secondary beams according to the positioning holes on the long beams, and fix them with m5.519 self-tapping screws. At the same time, the top of the π-shaped secondary beams and the base beams should be fixed with st4.816 round-head self-drilling screws.
  3. Floor Substrate Laying: Lay the floor substrate (magnesium oxide board) along the 6-meter direction. Pre-drill holes at both ends of the substrate and cut the corners according to the drawn chalk lines. Mark the centerline of the π-shaped beams, and start laying the floor from one end. The joint between two floor panels should coincide with the centerline of the π-shaped beams. After laying the floor, draw chalk lines on the floor according to the centerline marks of the π-shaped beams (two chalk lines are required at the joint, each deviating 20mm from the centerline), and fix the floor along the chalk lines with st4.2*38 cross-recessed flat-head self-tapping screws, with a nail spacing of 300 - 350mm.
  4. Floor Treatment: Sand the entire floor, especially the panel joints, apply PVC special floor adhesive, wait for 10 - 15 minutes, lay the floor covering, and expel the air between the floor covering and the substrate. If possible, perform welding treatment on the joints of the floor covering.

Installation Steps for Foldable Container Mobile Homes

  1. Frame Unfolding: Check the stability of the steel wire ropes, lift the main frame, unfold it smoothly, and place support rods in the middle of the container to maintain stability.
  2. Wall Installation: Push open one wall and tighten it with fastening screws, then push open the other wall with doors and windows and tighten the screws.
  3. Overall Positioning: Lift the foldable container house to the predetermined installation location and lower it after ensuring that there is no one around.