Nankai Container House Installation
The installation of container houses in Nankai should follow professional procedures and standards, and reference can be made to the installation experience and steps of professional manufacturers in Tianjin, such as Falilai.

I. Pre-installation Preparation
- Site Planning: Ensure that the installation ground is level and that the diagonal dimensions are consistent to provide a stable foundation for subsequent steps such as frame erection. For example, when installing packed container houses, Falilai first confirms that the ground is level, adjusts the outer edges of the columns to be perpendicular and flush with the top and ground frame outer edges, and then secures the bottom and top screws.
- Material and Tool Preparation: Prepare the required container house components, such as wall panels, roof panels, columns, rainwater pipes, etc., as well as installation tools, such as electric drills, wrenches, guide plates, etc. Different components require different tools for installation; for example, wall panel installation requires guide plate assistance, and bolt and nut tightening requires a wrench.
II. Installation Steps
- Frame Erection: Simply fix four columns with screws on the base plate, place the roof panel, and install the downspouts. This step should ensure the stability of the frame structure to provide support for subsequent installations.
- Wall Panel Installation: Carefully review the drawings and install the wall panels according to the codes. Note that the flat edges of the wall panels should be on the inside, and the镶嵌口 (inlaid edges) should face outward. When splicing, use steel strips to clamp at the notches, avoiding excessive force that could tear the panels. If the gap at the插口 (insertion points) is large, use blind rivets to re-secure them.
- Rainwater Pipe Installation: Start installation from the bottom, noting that the raised part is the bottom reducing joint of the pipe. Pull the middle part of the water pipe into a bow shape, align it symmetrically with the water inlet hole, and then relax it.
- Installation of Partitions, Internal Corners, Windows, etc.: Before installing the partition panels, first secure the corner aluminum with blind rivets on one side. Install the wall panels, door side panels, door head panels, and槽铝 (channel aluminum) at the door frames in order; cut the corner aluminum according to the internal dimensions to install the internal corners. The top corner line should be installed first, and the corner aluminum at the corners should not overlap; when installing windows, first secure the window frame aluminum and then install the windows and adjust them for a secure fit.
III. Post-installation Inspection and Maintenance
After installation is complete, check that all components are securely connected, such as whether the bolts and nuts are tightened and whether the wall panels are snug against the frame. At the same time, pay attention to maintenance during daily use, such as regularly checking whether the rainwater pipes are unobstructed and whether the wall panels are damaged. If any problems arise, contact the manufacturer promptly for repairs. For example, Falilai offers a 24-hour response time for any issues and on-site maintenance within 48 hours.