Methods of Assembling Prefabricated Houses

Quản trị 18 tháng 9, 2026

There are several main methods for assembling prefabricated houses:

Overlapping Assembly of Upper and Lower Boxes: This is a relatively common assembly method suitable for constructing buildings up to 12 stories. In non-seismic areas, for buildings with fewer than 5 stories, no additional connection measures are required between the boxes. The building's overall stability can be ensured by relying on the weight of the components themselves and the friction between them. However, when the building is located in a seismic area or has more stories, some strengthening connection measures are necessary. For example, post-tensioning can be applied horizontally or vertically to the building, causing the boxes to press against each other and form a unified whole. Alternatively, cast-in-place continuous balconies or corridors can be used to connect the box components. Bolts can also be used for connections between the boxes. Additionally, chain slots and notches can be reserved in the wall ribs or corners of the box components. After the boxes are installed in place, vertical cavities are formed, which are then reinforced with vertical steel bars and filled with concrete to create cast-in-place structural columns that connect the box components, enhancing the building's overall integrity and stability.

Interlaced and Stacked Assembly of Box Components: This assembly method offers certain economic benefits. Its advantage lies in avoiding the repeated use of adjacent sides of the boxes, thereby saving material costs to some extent.

Assembly of Box Components with Prefabricated Panels: This method is characterized by material savings and flexible layout design. For rooms with numerous equipment pipelines and heavy decoration workloads, using box components can reduce on-site workload and improve construction efficiency.

Assembly of Box Components with Frame Structures: The operation is relatively simple, requiring only the placement of box components on the frame structure. This assembly method can fully leverage the respective advantages of box components and frame structures.

Dismantling the Building into Independent Modules for Factory Manufacturing and On-site Assembly: This is a modern construction method that involves breaking down the building into individual independent modules. The manufacturing process is completed in the factory, including the ceiling, floor, water and electricity pipelines, etc., all prefabricated on the factory assembly line. Subsequently, these prefabricated modules are transported to the construction site and assembled like building blocks to form a complete building. This method significantly shortens the construction period and improves construction efficiency.