Demolition of Cement Prefabricated Houses in Maoming

Quản trị 18 tháng 9, 2026

The demolition of cement prefabricated houses in Maoming requires comprehensive consideration of various factors, including house characteristics, construction specifications, safety requirements, and policy regulations.

House Characteristics and Demolition Necessity

Some cement prefabricated houses in Maoming, mostly prefabricated panel buildings constructed in the 1970s and 1980s, have defects such as poor seismic performance, easy ground water seepage, poor sound and heat insulation, difficult structural modification, and a short service life (30 - 40 years). Therefore, there are calls for comprehensive demolition.

Key Points of Demolition Project Implementation

  • Supplier Qualifications: Taking the house demolition project in the residential area of the former Maoming Mining Bureau Building Materials Factory as an example, there are clear requirements for supplier qualifications, such as meeting the conditions specified in Article 22 of the Government Procurement Law of the People's Republic of China, fulfilling the qualification requirements for implementing government procurement policies, and specific qualification requirements (not being included in relevant dishonesty lists).
  • Personnel Qualifications: The operators involved in demolition construction need to be trained by training institutions of the administrative department and obtain relevant certificates before they can carry out construction work.
  • Safety Protection: Construction personnel should take protective measures when entering the construction site, operate on erected scaffolding, wear safety helmets, gloves, and safety shoes, etc. When working at heights, they should fasten their safety belts properly, with the safety belt hung high and used low, and the hanging point should be secure.
  • On-site Management: The demolition construction site should be equipped with fences and conspicuous warning signs, and a dedicated person should be assigned for supervision. Unauthorized personnel should not enter the site randomly. When entering the demolition construction site, technical personnel should give unified commands, strictly follow the demolition methods and procedures, and first remove the pipelines, equipment, electrical appliances, and lighting facilities connected to the demolished objects.
  • Demolition Sequence: During the demolition of buildings, the work should be carried out from top to bottom. It is strictly prohibited to demolish multiple floors simultaneously, and measures should be taken to prevent the collapse of other parts that have not yet been demolished during the demolition process. Adhere to the construction sequence of demolishing interior partition walls first and then the exterior walls.
  • Electrical Safety: The lighting equipment at the demolition construction site should not use the distribution lines of the demolished building but should be equipped with separate electrical lines.

Policy Regulations

According to the Implementation Measures for House Expropriation and Compensation and Resettlement on Collective Land in the Urban Areas of Maoming City, the district people's government shall issue an announcement in accordance with legal procedures, sign compensation and resettlement agreements with the expropriated persons, pay the compensation amounts, and the expropriated persons shall move out of the houses before the house demolition can be carried out.