Quay lại blog
Bài viết

Jining Container House Cost

Quản trị 15 tháng 9, 2026

The cost of container houses in Jining varies depending on the type, specifications, materials, and purchase form (new/used), with price ranges roughly from 300 yuan to over 2000 yuan per square meter, and overall house prices ranging from several thousand yuan to tens of thousands of yuan.

I. Cost of New Container Houses

  • Economy/Simple Type: Priced at approximately 300 yuan per square meter, suitable for short-term construction site dormitories, warehouses, etc. It has a simple structure, mostly made of color-coated steel plates, with average sound insulation.
  • Standard Type: Priced at approximately 400 yuan per square meter, a common type, such as light steel movable houses with a framed double-slope roof, suitable for general office or residential needs.
  • Luxury/Custom Type: Priced at approximately 1000 yuan per square meter, with better appearance and higher configuration, such as luxury flat-top movable houses, which can be customized according to needs.
  • High-end/Deluxe Type: Priced at over 2000 yuan per square meter, using better materials and interior decoration, possibly including tiled floors, real stone paint exterior walls, etc., suitable for long-term or high-end purposes.

II. Cost of Used Container Houses

  • Basic Refurbished Residential Type: Usually priced at less than 10,000 yuan, including rust removal and painting, replacement of old floors, and minor electrical and water repairs.
  • Premium Refurbished Residential Type: Price to be negotiated, possibly including high-end configurations such as new rock wool, Class A fireproof materials, new electrical circuits, PVC floors, and hollow windows.
  • Construction Site Special Discounted Containers: Priced at less than 3000 yuan, but with varying conditions, requiring self-payment for freight and lifting, generally not recommended for purchase.

III. Other Influencing Factors

  • Specifications and Area: The unit price for areas less than 100 square meters may increase by about 10%, while for areas over 500 square meters, the unit price may decrease by 10% to 15%. Two-story structures are 15% to 25% more expensive than the first floor.
  • Region and Transportation: Prices in first-tier cities may be 10% to 30% higher than those in second- and third-tier cities, and additional charges apply for transportation distances exceeding 50 kilometers.
  • Additional Costs: Foundation treatment may account for about 15% of the total cost, and in remote areas, labor and freight costs increase, leading to an increase in the unit price.