Demolition of Prefabricated Slab Houses in Jinhua
No direct policy documents specifically targeting the demolition of prefabricated slab houses in Jinhua have been found so far, but there are relevant safety inspection, management, and expropriation compensation standards available for reference.

Safety Inspection and Management of Prefabricated Slab Houses
In May 2024, Jinhua City initiated a new round of inspection and rectification work for safety hazards in multi-story prefabricated slab brick-concrete structure houses with three or more floors. Building on the 2022 housing census and the work of resolving the risks of dilapidated urban houses, construction departments in various counties (cities, districts) carried out a new round of special inspections for prefabricated slab houses. A detailed inventory was established for each prefabricated building, comprehensively grasping information such as its structural type, number of floors, building area, construction year, and housing usage status. The inspection was planned to be completed by September of the same year.
For houses found to have safety hazards during the inspection, a housing safety appraisal agency will be immediately commissioned to conduct a housing safety appraisal. For those identified as CD-grade dilapidated houses, immediate evacuation and prevention measures will be implemented; for those posing imminent safety accident risks, the housing usage safety emergency response plan will be immediately activated to ensure safety. At the same time, a physical risk resolution plan will be implemented for the CD-grade dilapidated houses found during the inspection, with options for demolition or repair and reinforcement.
Compensation Standards for Housing Expropriation on State-owned Land
If the prefabricated slab houses are involved in housing expropriation on state-owned land, reference can be made to the Compensation Standards for Temporary Relocation Fees and Relocation Fees for Residential Housing Expropriation on State-owned Land in Jinhua City in 2026. Among them, the compensation standard for temporary relocation fees is 18 yuan per square meter per month within the second ring road and 16 yuan per square meter per month outside the second ring road. If the temporary relocation fee for the expropriated residential housing is less than 1,200 yuan per household per month, it will be calculated at 1,200 yuan. The compensation standard for relocation fees includes moving fees and fixed facility compensation fees. For moving fees, for houses with a building area of 100 square meters (inclusive) or less, the moving fee is compensated at 2,000 yuan per household; for the part exceeding 100 square meters, an additional moving fee is charged at 8 yuan per square meter. Fixed facility compensation fees include 700 yuan per household for water supply with a "one-household-one-meter" system, etc.