Jiangsu Prefabricated House Installation
The installation of prefabricated houses in Jiangsu mainly includes forms such as factory-prefabricated on-site assembly, whole-house prefabricated module installation, and component mechanized hoisting construction.

The packing-box houses in Wujiang adopt the 'factory prefabrication + on-site assembly' model. The factory undertakes most of the work, completing up to 90% of the processes such as steel cutting, welding, and assembly of panels and pipelines. This model makes on-site construction extremely simple, requiring only hoisting and splicing, and connecting water and electricity for the house to be put into use. Its significant advantage lies in its extremely fast installation speed, with the entire installation work being able to be completed in as little as one day at the fastest, greatly shortening the construction cycle. It is especially suitable for projects with urgent time requirements, such as temporary office spaces and emergency rescue housing.
The Digital Cube Smart Houses of Kangboda Construction Technology Group achieve 100% factory whole-house prefabricated production and full prefabricated decoration. These houses are rapidly installed on-site in a modular manner, with meticulous planning starting from the organizational design stage to ensure precise对接 (docking) of each module. During the factory prefabrication process, strict quality control is implemented to ensure that each component meets the standards. From factory prefabrication to on-site installation completion, the entire process takes only about 30 days. This installation method not only guarantees the quality and precision of the house but also effectively reduces noise, dust, and other pollution from on-site construction, aligning with the concept of green buildings.
The products of Jiangsu Ge Gou Prefabricated House Component Co., Ltd. adopt the component mechanized hoisting construction method. The company produces components such as prefabricated composite slabs, prefabricated stair slabs, and prefabricated shear wall panels, which are prefabricated in the factory and then transported to the site. Using mechanized hoisting equipment, these components are precisely installed in place, which can significantly shorten the construction cycle and improve construction efficiency. This installation method reduces on-site wet operations, reduces reliance on manual labor, and at the same time improves construction safety and quality stability, making it suitable for various types of prefabricated building projects.




