Installation of Prefabricated Houses

Quản trị 17 tháng 9, 2026

The installation of prefabricated houses typically adopts a modular construction approach, combining factory prefabrication with on-site assembly, offering advantages such as short construction periods, environmental friendliness, and high efficiency. The specific process and technical highlights are as follows:

I. Core Installation Process

  1. Factory Prefabrication Stage
    Components such as ceilings, floors, walls, and plumbing and electrical systems are prefabricated on factory assembly lines. Some processes utilize automated assembly technologies, such as welding robot operations, which enhance component precision and production efficiency. Prefabricated components include beams, slabs, walls, and columns, with technical systems encompassing prefabricated concrete structures and steel structures. Depending on the type, prefabrication methods vary:
  • Panel-based Prefabrication: Uses prefabricated wall panels and floor slabs as core components, assembled through standardized connection nodes;
  • Box-based Prefabrication: Prefabricates functional units such as bathrooms and kitchens into independent 'boxes', increasing construction speed by 50%-70%;
  • Frame-based Prefabrication: Adopts a prestressed prefabricated concrete integrated frame structural system, suitable for high-rise buildings.
  1. On-site Assembly Stage
    After being transported to the construction site by transport equipment, prefabricated modules are assembled using machinery such as tower cranes according to design drawings. Each module is accompanied by detailed identification (such as project name, product model, production date) to ensure precise alignment. The assembly process follows the principle of 'main structure first, then enclosure', completing the installation of the structural framework before assembling walls, floor slabs, and decorative layers in sequence.

II. Technical Advantages and Case Study
Modular construction reduces construction periods by over 60% through parallel operations (simultaneous factory production and on-site foundation construction) and intelligent production lines. For example, in a public housing project in Shenzhen, Guangdong, 6,028 concrete modules were used for assembly, compressing the construction period from the traditional 2.5-3 years to just 1 year, and reducing on-site labor by approximately 50%. Additionally, factory prefabrication significantly reduces on-site noise, dust, and construction waste, meeting green building standards.

III. Applicable Scenarios and Precautions
Prefabricated houses are suitable for standardized buildings such as residential properties, schools, and hospitals, particularly for projects with tight deadlines or high environmental requirements. Before installation, site leveling and foundation construction must be completed, and transport routes must accommodate module dimensions. During construction, strict inspection of module connection nodes (such as bolt tightness and welding quality) is essential to avoid structural safety issues caused by assembly errors.