How to Write a Prefabricated House Contract

Quản trị 18 tháng 9, 2026

The following content can be referred to when writing a prefabricated house contract:

I. Information of Both Parties
Clearly specify the names/titles of Party A (the entrusting party) and Party B (the contractor), their legal representatives, addresses, contact information, and unified social credit codes/ID numbers to ensure the legal validity of the parties involved.

II. Detailed Description of the Subject Matter or Services

  1. Project Overview: Include the project name, location, house specifications (number of floors, area, structural form), and design requirements. Design drawings and technical requirements provided by Party A should be attached as contract annexes, having the same legal effect as the contract.
  2. Requirements for Prefabricated Components:
    • Component Types: Such as prefabricated beams, columns, slabs, walls, etc., with quantities determined according to the design drawings.
    • Quality Standards: Comply with national and local standards. Party B shall provide quality inspection reports and certificates of conformity.
    • Production Process: Party B shall adopt advanced processes and strictly follow operating procedures to ensure safety and quality.
  3. Scope of Work: Party B is responsible for the production, transportation, and installation of prefabricated components, including mold making, steel bar processing, concrete pouring, curing, lifting, joint treatment, and other full-process work.

III. Contract Price and Payment Terms

  1. Contract Price: Clearly state that the total price is a lump sum, covering all costs such as production, transportation, installation, and taxes. Unless otherwise agreed in the contract, Party A shall not pay any additional fees.
  2. Payment Terms: Payment can be arranged in stages, such as an advance payment after contract signing, progress payments upon completion of the main structure, a final payment after project acceptance, and a retention payment after the warranty period expires.

IV. Performance Period
Clearly define the total project duration and the duration of each stage (such as production period, installation period, and acceptance preparation period). The period shall be extended in case of legal holidays, and special circumstances shall be reported to Party A in advance.

V. Performance Location
Clearly specify the project location and the location for material delivery. The project risk shall transfer to Party A from the date of completion of the delivery of prefabricated components to the site.

VI. Inspection and Acceptance

  1. Acceptance Standards: Follow relevant laws and regulations.
  2. Acceptance Procedures: Conduct stage-by-stage acceptance (such as lifting, main structure, and final acceptance), which requires joint confirmation by representatives of both parties.
  3. Quality Objections: The receiving party shall raise written objections within a certain number of days after acceptance; otherwise, it shall be deemed as qualified.

VII. Other Clauses
Agree on clauses regarding force majeure, contract termination, and dispute resolution according to actual circumstances. For example, if the project delay caused by force majeure exceeds a certain number of days, both parties may negotiate to terminate the contract.

In the contract text, select the content in [ ] by marking with a √, fill in the blanks or mark with a × to delete. Both parties shall negotiate and determine the specific clauses, ensure consistency in all copies of the contract, and each hold at least one original copy.