How to Deal with Gaps in Prefabricated Houses

Quản trị 18 tháng 9, 2026

The treatment methods for gaps in prefabricated houses mainly include the following, and an appropriate solution should be selected based on the type and severity of the gaps:

  1. Use gap treatment agents For ordinary panel gaps, special treatment agents such as epoxy resin or polyurethane can be used for filling. These materials can penetrate into the gaps, and after curing, they form high-strength connections, significantly enhancing the overall performance and stability of the floor slab. During operation, ensure that the gaps are clean and dry, and control the filling amount according to the product instructions to avoid excessive overflow.

  2. Waterproofing treatment If the gaps are located in wet areas such as bathrooms and kitchens, waterproofing treatment should be given priority. High-molecular waterproof membranes can be laid to cover the gaps, or polyurethane waterproof coatings can be applied to form a continuous film layer. The waterproof layer should extend at least 15 cm to both sides of the gaps and ensure firm adhesion to the base layer to prevent moisture penetration, which could cause the floor slab to get damp, moldy, or the steel bars to rust.

  3. Install sealing strips For gaps that require frequent opening and closing or have dynamic displacements (such as around doors and windows), rubber or silicone sealing strips can be inserted. The sealing strips should be selected in specifications that match the gap width. During installation, keep them continuous without breaks. This can effectively block dust and pests, and also buffer structural deformations, extending the service life of the gaps.

  4. Paste joint tapes Pasting rubber or plastic joint tapes on the surface of the gaps can enhance the seismic and crack resistance of the structure. The joint tapes should completely cover the gaps and extend to the base layers on both sides. After being fixed with special adhesives, putty should be applied for leveling. This method can also block the transmission of sound and heat, and is suitable for areas with high requirements for sound insulation and heat insulation.

  5. Reinforcement with carbon fiber cloth For larger cracks with a width exceeding 0.3 mm, structural reinforcement is required. First, chisel the cracks to a depth of 5 cm and clean up the impurities. Then, apply a pure cement mortar interface agent, and pour fine aggregate concrete twice to a position 1 cm from the floor surface. Finally, paste carbon fiber cloth along the direction of the cracks for reinforcement. The carbon fiber cloth should be fully coated with structural adhesive, with an overlap length of not less than 20 cm, forming a composite reinforcement layer after curing.

  6. Non-shrinking epoxy assembly adhesive When assembling prefabricated panels, using non-shrinking epoxy adhesive can reduce shrinkage cracks. If cracks have already appeared, the surface plaster layer should be chiseled away to a depth of at least 10 cm, and a V-shaped notch should be chiseled. Then, use non-shrinking epoxy repair adhesive for leveling, and paste carbon fiber cloth for reinforcement. This material can automatically compensate for shrinkage stress and prevent crack expansion.

  7. Slope treatment For panel gaps with a large span, a slope with a gradient of 1:50 can be set to achieve a smooth transition. The base layer of the slope should be compacted and leveled, and steel wire mesh should be laid on the surface for reinforcement. Then, fine aggregate concrete should be poured for sloping. This method can improve the overall aesthetics of the floor slab and avoid water accumulation problems.

Precautions: During the treatment process, drilling holes in the prefabricated panels is strictly prohibited to avoid damaging the internal steel bars and affecting the load-bearing structure. For ceiling construction, etc., ensure that the hanging rods are installed in the panel gaps to avoid directly penetrating the floor slab.