House Prefabrication Contract

Quản trị 18 tháng 9, 2026

The house prefabrication contract is a written agreement that clarifies the rights and obligations of the employer and the contractor in the house prefabrication and addition project, covering core clauses such as project scope, price, and duration. The following elaborates on key elements:

I. Contract Subject
The project scope is limited to the addition of walls, floors, and roofs using prefabricated components on the basis of the existing house structure of Party A, with a total height not exceeding three floors and an increase in building area of 180 square meters. The material standards must comply with the Technical Specification for Assembled Concrete Structures, specifying parameters such as the steel bar strength grade and concrete strength grade of the prefabricated components to ensure structural safety and durability.

II. Contract Price
The total amount is RMB 6.4 million (including 13% VAT), payable in installments: 30% of the initial payment within 5 working days after contract signing; 40% upon completion of the main structure; 25% after project completion and acceptance; and the remaining 10% after the expiration of the warranty period. Settlement is based on the actual completed project volume. If design changes result in an increase or decrease in the project volume exceeding 5% of the total contract price, both parties need to renegotiate the unit price to avoid disputes arising from fluctuations in the project volume.

III. Performance Period
The total project duration is 480 calendar days, divided into three stages: 60 days for the production of prefabricated components, 120 days for on-site lifting and installation, and 60 days for project completion and acceptance preparation. The project duration starts from the date of contract signing and is extended on legal holidays. In special circumstances, Party A must be notified 15 days in advance to ensure controllable project progress.

IV. Performance Location and Risk Transfer
The project site is located at No. xx, xx Street, in the administrative region where Party A's domicile is located. Party B is responsible for transporting the prefabricated components to the designated stacking area at the construction site. From the date of completion of the component arrival, the project risks are transferred to Party A, clarifying the risk division node and reducing performance disputes.

V. Inspection and Acceptance
The acceptance standards are implemented in accordance with relevant legal provisions. The phased acceptance procedures include three stages: lifting of prefabricated components, completion of the main structure, and project completion and acceptance, all of which require joint confirmation by representatives of both parties. The receiving party must raise written quality objections within 3 days after acceptance, and逾期 (overdue) acceptance is deemed as qualified, ensuring the standardization and timeliness of the acceptance process.

It should be noted that the nature of a house prefabrication contract differs from that of a presale contract. The latter is a special sales contract between the pre-purchaser and the pre-seller for the future delivery of goods, commonly found in the real estate sector, requiring presale qualifications and registration for filing. In contrast, the former focuses on the project construction phase, with fundamental differences between the two in terms of subject matter, rights and obligations, and legal requirements.