The installation of outdoor mobile toilets in Handan should follow the following steps and specifications:

1. Preliminary Preparations
Determine the toilet specifications (such as single-unit or modular) and functional configurations (such as barrier-free facilities and water-saving systems) based on the usage scenario. The production unit should complete the overall assembly and internal equipment debugging, including testing of the sewage system, ventilation devices, and water and electricity connections. Before transportation, survey the route, assess road width, turning radius, and overhead obstacles, and reserve space for lifting equipment operations in special terrains.

2. Loading, Unloading, and Fixing Procedures
Use large transport vehicles for delivery and perform professional lifting through top lifting rings or bottom forklift slots. Ensure even force distribution on the lifting straps during operation to avoid structural damage. After loading, connect the toilet bottom to the vehicle's fixing frame at multiple points using straps, add anti-slip pads, and use windbreak ropes for reinforcement during long-distance transportation. All operators should wear safety protective equipment, and warning signs should be set up in the work area.

3. Transportation Process Management
Maintain smooth driving during transportation, and the driver should regularly check the fixing status and confirm whether the straps are loose after driving on bumpy roads. For oversized and over-height specifications, report the passage time in advance and arrange guide vehicles if necessary. When passing through bridges, tunnels, and other height-restricted sections, measure and confirm the passability in advance. Avoid high-temperature periods for transportation in summer to prevent equipment failure due to sun exposure.

4. On-site Installation Steps
Clean and level the site, and confirm the positions of the sewage pipes and septic tank according to the preset foundation drawings. Use lifting equipment to slowly place the toilet on the foundation, adjusting the levelness error within the allowable range. When connecting pipes, use double protection with rubber rings and sealant; when connecting water and electricity lines, pressure test the water supply pipes, ensure reliable grounding of the electrical system, and make all connections waterproof.

5. System Debugging and Acceptance
Conduct a full-system trial run to check the operation of the flushing device, lighting system, and ventilation equipment in sequence. Test the flushing cycle of water-saving equipment multiple times to ensure the smoothness of the sewage pipeline. Test the applicability of barrier-free facilities, including the firmness of handrails and the turning space for wheelchairs. After debugging, clean and disinfect the internal facilities and provide training on use and maintenance to operators.

6. Response to Special Situations
Pour a concrete foundation for soft ground and install leveling brackets for sloped sites. In winter installation, install heating tapes on the water supply pipes to prevent freezing.