Quay lại blog
Bài viết

Ganzhou Prefabricated Panel Houses

Quản trị 18 tháng 9, 2026

Ganzhou's prefabricated panel houses have clear regulations and measures in place for safety hazard identification, renovation, and specific construction handling.

Safety Hazard Identification

Ganzhou City employs a dual mechanism of 'street (township) identification and county (city, district) verification' for the identification of safety hazards in prefabricated panel houses. This comprehensive and meticulous approach enables precise location of various safety hazards present in these houses. Depending on the nature of the hazards, such as 'endangering public safety, having design or construction defects, or general hazards,' targeted treatment measures are implemented. This categorization approach facilitates rational resource allocation, prioritizing the resolution of the most urgent and severe issues to safeguard residents' lives and property.

Renovation Methods

When promoting the renovation of urban dilapidated houses in Ganzhou, full consideration is given to the actual conditions of prefabricated panel houses, and various renovation methods are adopted according to local conditions. These include demolition and reconstruction, where houses with severe safety hazards that cannot be repaired through other means are demolished and rebuilt from scratch to eliminate hazards fundamentally; renovation, where part of the structure or facilities of the house are upgraded while retaining the original building structure to enhance safety and functionality; and in-situ reconstruction, where new houses are built on the original site to ensure compliance with modern building safety standards. In 2024, Ganzhou has initiated the renovation of 4,943 urban dilapidated houses, which will effectively improve residents' living conditions.

Key Points for Adding Staircases to Old Houses

When adding staircases to old houses in Ganzhou that are constructed with prefabricated panels, the approach differs from that for cast-in-place floors. Since indiscriminate cutting of prefabricated panels can alter the load-bearing relationships, it is essential to confirm key information such as floor thickness, span, and whether the floor is prefabricated before construction. After marking the dimensions of the opening, it is crucial to reserve edge beams and load-bearing positions, which are vital for ensuring structural safety. During the cutting process, wall saws should be used for straight cuts, water drills for corner cuts, and local removal should follow. After cutting, reinforcement bar section treatment should be carried out, and an opening reinforcement plan should be formulated to ensure the structural stability of the house after adding the staircase and prevent new safety hazards from arising due to construction.