Placement of Container Houses in Diqing
The placement of container houses in Diqing requires comprehensive consideration of factors such as site selection, foundation construction, installation specifications, and climate adaptability. The specific key points are as follows:

1. Site Selection and Site Requirements
Choose areas with flat terrain and good drainage, avoiding low-lying areas prone to water accumulation or geologically soft zones. For high-altitude construction scenarios (such as transportation infrastructure projects), it is essential to focus on evaluating wind resistance, earthquake resistance, and moisture resistance. For example, Beijing Falilai's container products have a wind resistance rating of up to Level 12 and an earthquake resistance rating of up to Level 8, making them suitable for extreme environments such as permafrost and low air pressure at high altitudes. The site should reserve transportation channels to ensure smooth operation of container lifting equipment (such as cranes).
2. Key Points of Foundation Construction
- Ground Treatment: For ordinary sites, the ground should be compacted and paved with gravel or a concrete cushion, with a recommended thickness of 10-15 cm to ensure uniform load-bearing capacity.
- Fixing Method: Use ground anchor bolts or expansion screws to fix the bottom frame of the container to the foundation, preventing displacement caused by strong winds. In high-altitude areas, the density of fixing points should be increased. For example, in the Sichuan-Tibet Railway project, where more than 500 containers were used, stability was enhanced by strengthening structural connection nodes.
- Waterproof Sealing: Apply waterproof glue or install sealing strips at the joints of the container, paying special attention to the drainage design at the junction of the roof and walls to prevent rainwater leakage.
3. Installation Specifications and Acceptance
- Modular Assembly: If using foldable containers or packing-box units, follow the manufacturer's instructions to unfold and lock the structure. For example, the products of Jihang Business Department achieve rapid deployment through modular design.
- Electrical and Pipeline Embedding: Plan water and electricity lines in advance and embed pipelines during foundation construction to avoid damaging the structure through later excavation.
- Acceptance Standards: Check the smoothness of door and window opening and closing, the verticality of walls, and the flatness of the ground to ensure compliance with the structural performance requirements in the "Technical Specifications for the Selection of Integrated Houses."
4. Climate Adaptability Optimization
In the Diqing area, where ultraviolet radiation is strong and the rainy season is concentrated, corrosion-resistant materials (such as hot-dip galvanized steel structures) should be used, and the roof slope should be increased (recommended ≥5%) to accelerate drainage. In winter, check the integrity of the insulation layer. For example, the thickness of color-steel sandwich panels (commonly 5 cm or 7.5 cm) directly affects heat insulation performance. For long-term residence, it is recommended to install double-glazed windows to improve energy efficiency.
5. Recommendations for Service Provider Selection
Prioritize enterprises that provide full-chain services, such as Yunnan Wangjia Company, which can complete surveying, production, transportation, installation, and after-sales services in a closed loop, reducing coordination costs among multiple suppliers. For high-altitude projects, confirm whether the service provider has localized case experience. For example, Lhasa Jihang Business Department has provided customized solutions for Nagqu, Nyingchi, and other places, proving that its products can adapt to high-altitude environments.