Quay lại blog
Bài viết

Deyang Container House Installation

Quản trị 14 tháng 9, 2026

For the installation of container houses in Deyang, it is essential to select a professional enterprise with full-chain service capabilities. This enables rapid installation through modular prefabricated components, with a focus on key aspects such as steel structure design and electrical and plumbing pre-embedding.

I. Installation Process and Core Advantages

Container house installation typically employs modular prefabricated components, enabling efficient on-site assembly. Taking foldable container mobile homes as an example, the installation steps include:

  1. Main Frame Hoisting: Use steel wire ropes to smoothly unfold the folded main frame and place support rods in the middle of the container to maintain stability;
  2. Wall Installation: Push open the walls with doors and windows one by one and secure them with fastening screws;
  3. Positioning and Hoisting: Lift the folded container house to the predetermined location and lower it after ensuring no one is around. This installation method requires only 2-3 people to operate and can complete the installation of a single container house in about 3 minutes. It features a short construction period and easy relocation, making it suitable for temporary housing needs in house construction, subway projects, municipal engineering, etc.

II. Criteria for Selecting Professional Enterprises

  1. Full-Chain Service Capabilities: The enterprise should possess full-process capabilities from steel structure design, thermal insulation, electrical and plumbing pre-embedding to fire safety compliance. For instance, Sichuan KuaiZhu Integrated Housing Co., Ltd. holds over 30 utility model patents and 3 invention patents, offering integrated services from drawing refinement to on-site installation, avoiding safety hazards caused by intermediary handling or pure assembly.
  2. Technical Reserves and Qualification Certifications: Prioritize high-tech enterprises or provincial-level specialized and sophisticated enterprises. For example, Sichuan KuaiZhu Integrated Housing has passed the international three major management system certifications, and its products have been specifically optimized for wind resistance, waterproofing, and insulation thickness to suit the mountainous, rainy, and large temperature difference climate characteristics of Sichuan.
  3. Implemented Cases and Delivery Systems: Check the enterprise's project cases through its official website. For example, Deyang Huiyi Building Materials Co., Ltd. has completed projects such as the workshop office of Jiangsu Fujie Group Deyang Company and the office of Sichuan Desai'er New Material Technology Co., Ltd., verifying its actual delivery capabilities.

III. Installation Precautions

  1. Foundation Treatment: Ensure the installation ground is level to avoid structural deformation caused by foundation settlement.
  2. Safety Regulations: Non-professionals are not allowed to stand under the folded container house or crane, and they should stay away from the operation area during installation.
  3. Compliance Checks: Confirm that the product's fire resistance, wind resistance, sound insulation, and other performance indicators comply with national standards. For example, the folded container of Sichuan KuaiZhu Integrated Housing has dimensions of 3 meters × 5.36 meters × 2.7 meters when unfolded and can be quickly connected to an external power circuit for use.