Quay lại blog
Bài viết

Dazu Mobile Toilet Installation

Quản trị 22 tháng 9, 2026

The installation methods of mobile toilets in Dazu mainly fall into two categories: general mobile toilets and sit-down mobile toilets, with specific installation steps as follows:

For general mobile toilets, after receiving the goods, it is necessary to prepare tools such as an electric drill, a 4.2-millimeter drill bit, and a rivet gun in advance. During installation, first install the inner corners in sequence, which is the foundational step for constructing the toilet frame. Next, insert the panels into the slots for assembly and ensure they are aligned properly to guarantee the stability of the toilet structure. After that, use the drill bit to make holes at the corresponding positions, then insert the rivets and secure them with the rivet gun to tightly connect all the components, forming a sturdy overall structure.

The installation steps for sit-down mobile toilets are relatively more detailed. First, install the side panels and then fasten the buckles after installation to ensure the side panels are stable. Then install the door panels, also fasten the buckles, and pay special attention to preventing others from easily opening them to safeguard the privacy and safety of users. Next, install the tissue dispenser and urinal, ensuring these accessories are placed in reasonable positions for the convenience of users. After all components are installed, check again and fasten all the buckles to ensure that every part of the toilet is tightly connected without any loose areas.

In addition, the mobile toilets produced by manufacturers in Dazu County usually adopt an integral or assembled box structure. This structure has already completed the installation of the main structure, interior decoration, pipeline pre-installation, and even sanitary ware in the factory, greatly reducing the workload of on-site installation. When the mobile toilets are transported to the site, only simple leveling is required to ensure that the toilets are placed steadily without wobbling or tilting. If there is a need to connect the mobile toilets to external power sources and sewage pipes, corresponding connection work should also be carried out. After completing these steps, the mobile toilets can be put into use.