Container House Installation Video
Quản trị 15 tháng 9, 2026
Currently, there is no direct link to a complete installation video for container houses, but you can refer to the following installation plans and diagram resources:

I. Diagram for Installing Foldable Container Mobile Homes (Completed in Three Minutes)
The installation process for Tengfei's third-generation foldable container mobile homes has been standardized into diagrams, with core steps including:
- Main Frame Hoisting: After checking the stability of the steel wire ropes, use a crane to smoothly unfold the main frame in its folded state and place support rods in the middle of the container to maintain structural stability.
- Wall Installation: First, push open an ordinary wall and secure it with fastening screws; then, push open the wall with doors and windows and tighten the screws to ensure airtightness.
- Positioning and Hoisting: Hoist the folded container house to the predetermined location, confirm that there is no one around, and slowly lower it to avoid collision or tipping risks. Safety Tips: Non-professionals should stay away from the installation area, and standing under the container or crane during hoisting is prohibited. Resource Link: Diagram for Installing Foldable Container Mobile Homes
II. Installation Diagram for Container Panel Houses (Step-by-Step Explanation)
The assembly instructions for modular container houses released by Boyuan Box Houses cover the assembly details of modules such as the bottom frame, walls, and floor:
- Bottom Frame Installation: Connect the box bottom corners with the bottom beams on a flat ground, and use hexagon socket bolts for initial fixation. After adjusting the diagonal error of the bottom frame to be ≤3mm, tighten the bolts.
- Secondary Beam and Floor Laying: Install π-shaped secondary beams according to the positioning holes of the long beams, fix them with self-tapping screws, and then lay magnesium oxide board substrates. Mark the floor splicing positions along the centerline of the π-shaped beams.
- Floor Fixation and Polishing: Fix the floor with cross-head燕尾丝 (a type of screw, translated as 'dovetail screws' here, but keep the original term if it's a specific product name), with an interval of 300-350mm; polish the board seams, apply PVC special adhesive, lay the floor glue, and expel the air. Resource Link: Installation Diagram for Container Panel Houses
III. Optimization Suggestions for the Construction Plan of Container Mobile Homes
For long-term outdoor use scenarios, it is essential to focus on wind and earthquake resistance as well as drainage design:
- Foundation Treatment: Plan the flatness of the foundation in advance and pre-bury drainage pipes to avoid structural corrosion caused by water accumulation.
- Reinforcement Measures: Reinforce the corners of the house with steel frames, pour concrete piers at the bottom, and use anti-corrosion wood exterior walls to enhance durability.
- Modular Expansion: Choose upgraded container houses with built-in doors, windows, and circuit预留口 (reserved openings, translated as 'reserved openings' here). Only simple wiring and fixation are required on-site, and two people can complete the installation in half a day. Case Reference: Construction Plan for Mobile Guards by Guangzhou Manufacturers
IV. Other Related Resources
- Ten Fold Modular House Transformation Video: Shows the dynamic process of a container transforming into a villa, suitable for understanding modular design principles. Video Link
- Chengdong Camp Container House Cases: Provides engineering camp construction experience from over 100 countries worldwide, covering overall solutions such as camp planning and logistics transportation. Detailed Introduction