Quay lại blog
Bài viết

Container House Construction Cost

Quản trị 15 tháng 9, 2026

The construction cost of container houses varies due to multiple factors, roughly ranging from 300 yuan to over 2000 yuan per square meter, with the price of a single container house ranging from 5000 yuan to tens of thousands of yuan.

Price Range per Square Meter

  • Simple/Economy Type: Approximately 300 yuan per square meter, with a simple structure, mostly used for short-term construction site dormitories, warehouses, etc.
  • Standard Type: Approximately 400 yuan per square meter, common types such as light steel mobile houses with a double-slope roof and framework, suitable for general temporary living or office needs.
  • Luxury/Custom Type: Approximately 1000 yuan per square meter, with a better appearance and higher configuration, such as luxury flat-top mobile houses, meeting the needs of users with certain requirements for living quality.
  • High-end/Deluxe Type: Can reach 2000 yuan or even higher per square meter, using better materials and interior decoration, possibly including tiled floors, real stone paint exterior walls, etc., suitable for long-term or high-end purposes.

Price of a Single Container House

  • Basic New Container House: A standard 3m x 6m (approximately 18 square meters) container house has a wide price range, possibly "tens of thousands of yuan."
  • Second-hand Container House: The price is usually within 10,000 yuan, with some priced around 5000 yuan.

Core Factors Affecting Price

  • Material: Color steel plates are cheaper but have poor sound insulation; rock wool sandwich panels are about 30% more expensive but offer better fire protection and insulation; EPS core materials have lower costs but slightly weaker performance. The thickness of the panels and the color steel skin also directly affect the price.
  • Specification: When the area is less than 100 square meters, the unit price increases by about 10%; when the area is greater than 500 square meters, the unit price decreases by 10-15%. A two-story structure is 15-25% more expensive than the first floor.
  • Region: Prices in first-tier cities are 10-30% higher than those in second- and third-tier cities; when the transportation distance exceeds 50 kilometers, additional charges are applied based on the distance.
  • Additional Costs: Foundation treatment may account for about 15% of the total cost.
  • Project Volume: The larger the area, the lower the unit price; for small-area scattered constructions, the unit price will be much higher.