Container House Assembly Process

Quản trị 15 tháng 9, 2026

The assembly process of container houses mainly includes steps such as selection, foundation preparation, main body assembly, internal installation, and decoration.

I. Selection Stage Selection should be based on needs for structural types:

  • Welded Integral Box: Factory-welded as a whole, with a direct force path, strong resistance to deformation, and suitable for frequent lifting and movement.
  • Bolt-Connected Modular Box: Uses standard plates connected by bolts. Check the steel wall thickness of columns and bottom beams (common specifications range from 1.5 mm to 3 mm). Thicker walls provide greater load-bearing redundancy but also increase self-weight.

II. Foundation Preparation

  • Ground Treatment: Ensure the ground is level or use a workbench as the installation foundation.
  • Bottom Frame Installation: Connect the box bottom corners to the bottom beams using hex socket bolts without tightening them initially. After alignment (ensuring the diagonal difference of the bottom frame is ≤3 mm), tighten the bolts.
  • Secondary Beam and Floor Installation: Install π-shaped secondary beams according to the positioning holes on the long beams, securing them with self-tapping screws and round-head drill tail screws. Lay the floor base plates along the 6-meter direction, cut angles according to the chalk line, and fix them with nails at intervals of 300-350 mm.

III. Main Body Assembly

  • Steel Structure Assembly: Assemble square tube columns and steel beams with screws, checking for vertical and straight alignment of the steel beams and ensuring component dimensions meet requirements.
  • Wall and Roof Panel Installation: Reserve openings at door and window positions, then install wall panels and roof panels sequentially, ensuring tight seals.
  • Folding Container Installation: Check the stability of steel wire ropes, lift the main frame and unfold it, place support rods to maintain stability, push open the walls and secure them with fastening screws, and finally lift to the predetermined position.

IV. Internal Installation and Decoration

  • Water and Electricity Installation: Connect water and electricity lines after completing module assembly.
  • Decoration: Carry out interior finishing according to needs, such as laying floor rubber, installing multi-functional furniture, etc.

V. Inspection and Maintenance

  • Inspection Standards: Check the verticality of stacked boxes, seismic and anti-loosening treatments at node connections, and the quality of waterproof sealing work.
  • Usage and Maintenance: Regularly inspect structural stability to ensure safe use.