Installation of Formwork for Concrete Prefabricated Houses

Quản trị 18 tháng 9, 2026

The installation of formwork for concrete prefabricated houses should follow the following key steps and specification points:

I. Preparations Before Formwork Installation

  1. Formwork Cleaning and Moistening
    Before pouring concrete, thoroughly remove debris (such as wood chips and dust) from the formwork to avoid affecting the bonding quality between the concrete and the formwork. At the same time, moisten the surface of the formwork with water to prevent excessive absorption of moisture from the concrete by the formwork, which could lead to defects such as honeycombing and pitting on the surface.

  2. Selection of Formwork Support Method
    Choose an appropriate formwork support method based on the type of prefabricated component. For example, when installing prefabricated concrete floor slabs, the rigid frame formwork method is usually adopted: first, construct a formwork support system, place the floor slab directly on the formwork, ensure accurate positioning of the component by calibrating dimensions, and then pour the concrete. This method can improve construction efficiency and reduce errors in secondary adjustments.

II. Core Requirements for Formwork Installation

  1. Flatness Control
    After formwork installation, check its surface flatness. The error should comply with specification requirements (generally not exceeding 3mm/2m). If the formwork is locally deformed, it should be resolved through reinforcement or replacement; otherwise, it will lead to uneven surfaces on the prefabricated components, affecting structural safety and aesthetics.

  2. Joint Treatment
    The joints between formwork panels should be tight, with the joint width controlled within 1.5mm to prevent concrete leakage during pouring. Double-sided adhesive strips or sealants can be used to fill the joints, and bolts or clamps can be used to secure the formwork to ensure no misalignment at the joints.

  3. Stability of the Support System
    The formwork support should be firm to prevent displacement or deformation of the formwork due to the lateral pressure of the concrete during pouring. The specifications and spacing of support materials (such as steel pipes and wooden beams) should be determined through calculations to ensure they meet the load-bearing requirements.

III. Quality Inspection After Installation

  1. Dimension Calibration
    Use a laser level or steel ruler to verify the elevation, axis position, and component dimensions of the formwork to ensure they comply with the design drawings.

  2. Fixing of Embedded Parts
    If there are embedded parts (such as bolts and pipeline sleeves) in the formwork, check whether their positions are accurate and whether they are firmly fixed to avoid displacement after pouring.

  3. Safety Protection
    After formwork installation is complete, set up guardrails or warning signs to prevent construction personnel from stepping on the formwork, which could cause deformation or falling accidents.

Summary: The installation of formwork for concrete prefabricated houses requires strict control over cleaning, formwork support, joint treatment, and support systems. By controlling key indicators such as flatness, joint width, and dimensions, the molding quality and construction safety of prefabricated components can be ensured.