The Chinese prefabricated house customization plan requires comprehensive planning from three aspects: construction deployment, process, and design key points, to ensure quality, safety, efficiency, and cost control.

I. Overall Construction Deployment

  1. Quality Objectives: Strictly adhere to the "Technical Specification for Prefabricated Concrete Structures." The foundation concrete strength must reach above C30, with a verticality deviation of prefabricated component installation ≤3mm/m and surface flatness ≤5mm/2m. The position deviation of embedded parts should be controlled within ±5mm, with a grout fullness rate ≥95% and a deviation in the thickness of the steel bar protective layer ≤3mm, ensuring structural stability and durability.
  2. Safety Objectives: With a core focus of "zero deaths and zero serious injuries," the minor injury frequency should be controlled within 3‰. The certification rate of special operation personnel, compliance rate of temporary electricity use, acceptance pass rate of scaffolding and high-formwork support, regular inspection rate of lifting machinery, and equipment rate of safety protection facilities should all reach 100%, reducing risks through standardized management.
  3. Progress Objectives: The total construction period is 120 calendar days, adopting a four-level progress control: Phase 1 (45 days) completes component detailed design and factory production; Phase 2 (50 days) conducts foundation construction and main structure installation (each floor cycle ≤7 days); Phase 3 (25 days) completes decoration and equipment installation; Phase 4 (10 days) organizes acceptance and rectification. The critical path is foundation construction → main structure installation → roofing works → completion acceptance.
  4. Cost Objectives: The unit construction cost should be controlled within 1800 yuan/㎡, reducing material loss rate to below 3% and increasing machinery utilization rate to above 85% through factory production. Specific measures include centralized steel bar processing to save 15% in losses, prefabricated concrete components to reduce 20% in on-site waste, increasing formwork turnover times to over 30, and modular plumbing and electrical construction to reduce labor costs by 10%.

II. Construction Process (Export Example)

  1. Custom Production and Modular Packaging: Customize the house type, style, and functions according to customer needs, with factory mass production of modules that are uniformly coded and classified for acceptance. Modules should be waterproof, corrosion-resistant, and shock-resistant, suitable for ocean shipping environments.
  2. Transportation and Logistics: Finished modules are transferred to domestic ports via special flatbed trucks, with dimensions matching international standard containers to reduce transportation costs. Logistics cover more than 150 countries and regions worldwide, reaching Southeast Asia in 1 week, the Middle East in over 20 days, and Europe and America in 1 month, with full traceability.
  3. Overseas Assembly: Upon arrival, modules are directly transported to the site, requiring no wall construction, plastering, or pipeline laying. Assembly is completed through crane lifting and interface connection, with water and electricity connected for immediate use, significantly improving construction efficiency.

III. Design Key Points (New Chinese-style Villa Example)

  1. Style Design: Integrate Eastern cultural elements, with an exterior featuring ivory white imitation stone paint walls and dark gray window frame lines, paired with large floor-to-ceiling windows for both lighting and a sense of solemnity.
  2. Layout Design: Flexibly adjust the interior space according to customer needs. For example, a three-story villa might include an entrance hall, living room, bedroom, and kitchen on the first floor; a double-height living room, bedroom, and balcony on the second floor; and a game room, terrace, and private bathroom on the third floor, meeting multifunctional needs.