Chaoyang Container House Installation
The installation of container houses in Chaoyang should follow a professional process, covering basic preparation, structural assembly, installation of supporting facilities, and acceptance inspection. The specific steps are as follows:

I. Pre-installation Preparation
- Site Planning: Choose a flat and solid ground to avoid soft soil or slopes, preventing house settlement or tilting. If the foundation is soft, harden it (e.g., pour a concrete foundation) or use a workbench to assist in installation.
- Material and Tool Inspection: Confirm that materials such as container bottom frames, bottom beams, π-shaped secondary beams, floor base plates (magnesium oxide boards), self-tapping screws, and round-head drill tail screws are complete, and prepare tools such as hexagon socket bolts, cross-head flat-tail screws, and PVC floor adhesive.
- Safety Protection: Installation personnel should wear safety helmets and gloves, check the stability of lifting equipment (such as cranes), and ensure that the construction environment is free from the risk of falling objects.
II. Structural Assembly Process
- Bottom Frame Installation:
- Connect the bottom corners of the container to the bottom beams and initially fix them with hexagon socket bolts, without fully tightening them yet.
- Adjust the diagonal error of the bottom frame to be ≤3mm and then fully tighten the bolts.
- Secondary Beam and Floor Installation:
- Install π-shaped secondary beams according to the positioning holes of the long beams, fix them with M5.5×19 self-tapping screws, and add ST4.8×16 round-head drill tail screws at the connection points between the tops of the secondary beams and the bottom beams.
- Lay magnesium oxide floor base plates, splice them along the 6-meter direction, and fix them after cutting the corners according to the chalk lines.
- Mark and snap a line along the centerline of the π-shaped beams, lay the floor, and drive ST4.2×38 cross-head flat-tail screws along the chalk lines, with a nail spacing of 300-350mm.
- Floor Treatment:
- Sand the joints of the floor, apply PVC special floor adhesive, lay the floor covering after 10-15 minutes, expel air, and weld the joints (if conditions permit).
III. Installation of Supporting Facilities
- Doors, Windows, and Partitions: Open holes at any position according to design requirements to install doors and windows. Indoor partitions can be set along the transverse axis, and stairs can be placed indoors or outdoors.
- Electrical Circuits and Lighting: Pre-bury electrical circuit pipes, install sockets, switches, and lighting fixtures, and ensure waterproofing and leakage prevention.
- Waterproofing Treatment: The house adopts a waterproof structural design, but it is necessary to check the sealing of the roof and joints and supplement with waterproof adhesive if necessary.
IV. Acceptance Inspection and Maintenance
- Structural Stability Inspection: Confirm that all bolts are tightened, the house is stable without shaking, and doors and windows open and close smoothly.
- Waterproof Test: Pour water to check for leaks on the roof and joints.
- Regular Maintenance: Check for loose bolts every six months, replace aging sealing strips, and clean drainage troughs.
Tip: Merchants providing container house installation services in Chaoyang include Beijing Yuanhao Integrated Housing and Beijing Hongzhu Integrated Housing, etc. They can provide one-stop services from design, transportation to installation, support custom sizes and layouts, and are suitable for various scenarios such as temporary housing on construction sites and warehousing.