Yuci Prefabricated Panel Houses
There are many prefabricated panel houses in Yuci, and there are numerous issues. Some houses have related news about demolition, but it is still unclear whether the prefabricated panel house opposite the Second Kindergarten on Yuhu North Road in Yuci will be demolished in 2025.

There are quite a few prefabricated panel houses in Yuci, and the problems are quite prominent. Opposite the Second Kindergarten on Yuhu North Road in Yuci, there are prefabricated panel houses built in the 1980s with an age of 44 years. They are severely aged, with large cracks in the roof and multiple instances of the outer wall's cement blocks falling off. In the urban area of Yuci, there are a large number of prefabricated panel buildings, including single-story houses and three- to four-story low-rise buildings. Built a long time ago, these buildings have outdated facilities. There are cracks in the walls, potential safety hazards in electricity and gas usage, a lack of fire protection facilities, and they are highly likely to collapse in the event of earthquakes and other disasters, affecting the city's image and social development. The prefabricated panel houses built in the 1990s in Jinxi Community, Yuci, under China Railway No.3 Engineering Group, shake like a magnitude-3.5 earthquake when trains pass by, and there are also various issues such as power and water outages and leaks. The Nangou dormitory of the Jinzhong Market Supervision Administration was built in 1988. Due to the demolition and reconstruction of Nangou Village, it has been without water, electricity, and road access since 2017, making it uninhabitable. The doors, windows, and household facilities have been stolen, the house has been severely damaged, and the drainage in the courtyard is also blocked.
In response to the issues of prefabricated panel buildings, some people have put forward relevant suggestions. Housing and construction departments can carefully inspect and register all prefabricated panel buildings in the district, carry out reasonable planning, formulate reasonable demolition plans, carefully organize and implement the demolition work, and resettle the demolished residents through methods such as monetary compensation or relocation and resettlement.
Regarding whether the prefabricated panel house opposite the Second Kindergarten on Yuhu North Road in Yuci will be demolished in 2025, due to the division of urban and district administrative functions, it has been submitted to the relevant departments directly under the Jinzhong Municipal Government. It is recommended to call the Municipal Planning and Natural Resources Bureau (Tel: 3203015) for detailed inquiries. Currently, it is impossible to directly determine whether the house will be demolished in 2025.




