Volver al blog
Artículo

Xiangtan Prefabricated House Sales

Admin 18 de septiembre de 2026

Information on the sale of prefabricated houses in Xiangtan City indicates that Hunan Zhongyi Zhugong Construction Technology Co., Ltd. can provide various types of prefabricated light steel structure houses, with specific cooperation plans to be selected based on project scale and type.

I. Types of Prefabricated Houses and Minimum Order Quantity Requirements The prefabricated houses offered by the company are mainly light steel structures, covering types such as light steel villas, resettlement houses, and mobile villas. Among them, light steel villa projects require a minimum order quantity of ≥500 square meters, suitable for self-built residences or small community construction. If the demand is for a general plan for light steel villas, resettlement houses, or mobile villas, the minimum order quantity can be relaxed to ≥480 square meters, offering higher flexibility. Additionally, for large-scale projects, the company also provides prefabricated light steel houses, steel structure villas, and cold-formed thin-walled keel steel structure residential buildings, but these require a minimum order quantity of ≥5000 square meters, suitable for scenarios such as industrial parks and large resettlement areas.

II. Pricing System and Cost Differences The prices of prefabricated houses vary significantly depending on project scale and type. The unit price for light steel villa projects is 1100 yuan per square meter (≥500 square meters), while the unit price for general-purpose light steel houses (such as resettlement houses and mobile villas) is 1900 yuan per square meter (≥480 square meters). The higher price of the latter may be due to the inclusion of more customized designs or additional features. For large-scale projects (≥5000 square meters), the unit price for prefabricated light steel houses and cold-formed thin-walled keel villas is uniformly 860 yuan per square meter, offering significant cost advantages. However, it should be noted that such projects usually have higher requirements for construction periods and site conditions.

III. Cooperation Suggestions and Precautions

  1. Clarify Demand Scale: Choose the appropriate type based on land area, budget, and usage scenario. Small-scale projects should prioritize light steel villas or general-purpose houses, while large-scale projects can consider prefabricated solutions to reduce costs.
  2. Contact Suppliers Directly: Prices may adjust due to market fluctuations or changes in material costs. It is necessary to confirm the latest quotes and contract terms through official channels.
  3. Pay Attention to Additional Services: Some projects may include design, transportation, or installation services. It is essential to clarify the scope of services and associated costs during negotiations to avoid hidden costs.

The cost-effectiveness of prefabricated houses is significantly influenced by economies of scale. It is recommended to comprehensively evaluate costs and functions based on actual needs and choose the optimal plan.