Volver al blog
Artículo

Wusu Prefabricated Steel Structure Housing

Admin 18 de septiembre de 2026

The prefabricated steel structure housing in Wusu City adopts a core model of factory prefabrication and on-site assembly, widely applied in public welfare projects and commercial fields. It features high efficiency, earthquake resistance, and environmental protection, and is strongly supported by policies.

Production Model and Technological Advantages

China Railway Assembly Xinjiang Construction Development Co., Ltd. employs prefabricated component technology, pre-manufacturing building components such as steel bars and concrete in factories before transporting them to construction sites for assembly. Its annual production capacity for steel structure components reaches 40,000 tons, enhancing efficiency through intelligent production lines like plasma cutting and gantry welding. A single production line can produce 150-200 square meters per day, with the overall daily output exceeding 2,000 square meters. The products boast advantages such as green environmental protection, controllable quality, and strong earthquake resistance, making them suitable for urban renewal, earthquake-resistant housing, and other scenarios. For example, the steel structure quick-assembly houses for herders along the Tianshan Mountains adopt this technology, offering fast construction and excellent waterproof performance.

Public Welfare Project Application Cases

  1. Herder Resettlement Project: In 2024, China Railway Assembly Xinjiang built over 100 sets of steel structure quick-assembly houses in Bayingou, producing 15 sets per day with 30 teams working simultaneously. These houses are provided free of charge by the government to address the resettlement needs of herders.
  2. Winter Grazing Point Production Houses: Towns such as Xidagou in Wusu City have constructed steel structure + cement wall panel houses for herders, each covering 25.37 square meters with a one-bedroom, one-living-room layout and a total cost of over 40,000 yuan, fully funded by the government. The city plans to build 468 such houses in 2024, with completion expected by the end of September.

Commercial Use and Supporting Facilities

A steel structure commercial building is located on the west side of the intersection of Talimu River East Road and Tianjin Road in Wusu City, covering an area of 5,032 square meters with a building area of 1,017.35 square meters and no common area. It features complete supporting facilities and is currently open for business investment from enterprises in industries such as catering services and small commodity wholesale and retail, providing low-cost, high-efficiency spaces for commercial activities.

Policy Support and Popularization Promotion

The steel structure housing project aligns with Wusu City's requirements for urban-rural earthquake-resistant housing projects and public welfare initiatives. The government promotes its popularization through policies such as fully funding the construction of herder housing and providing rental discounts. For example, both the herder resettlement project and the winter grazing point houses are funded by the government, reducing the financial burden on residents and promoting the widespread application of steel structure buildings in the public welfare sector.