Wusu cement prefabricated housing is a building form mainly based on prefabricated reinforced concrete structures, featuring strong earthquake resistance, reliable structure, high-quality materials, and efficient construction.

In terms of earthquake resistance: Wusu cement prefabricated housing has a designed service life of 50 years, with a seismic fortification intensity of 8 degrees and a seismic grade of II. Its geological structure belongs to the Junggar-Tianshan fold system in the Tianshan-Xing'an geosyncline area. The site is classified as Class II, and the design earthquake group is Group II. Through scientific geological assessment and seismic design, it can effectively withstand earthquake disasters.

In terms of structural form: It adopts an assembled monolithic reinforced concrete frame structure, with standard module dimensions of 6m×3m×3m and a self-weight of 12 tons per module. The overall integrity is enhanced through bidirectional reinforced concrete ring beams (with a cross-section of 240×300mm, equipped with 4Φ12 longitudinal bars + Φ8@200 stirrups) and structural columns (with a cross-section of 240×240mm, equipped with 4Φ14 longitudinal bars + Φ8@100/200 stirrups). The module connection joints use a combined system of grouting sleeves and prestressed bolts to ensure structural safety and stability.

In terms of material requirements: P.O42.5 ordinary Portland cement is selected for the cement. For the steel bars, HRB400E hot-rolled ribbed steel bars (with a yield strength of ≥400MPa) and HPB300 structural steel bars are used. The grouting material is a non-shrink high-strength type (with a 28d compressive strength of ≥85MPa), and the connectors are M20 high-strength bolts (with a performance grade of 8.8). All materials must pass strict inspections. For example, steel bars are re-inspected for mechanical properties in batches of 60 tons, and the grouting material needs to be tested for bleeding rate, expansion rate, and strength.

In terms of construction technology: A flow-line operation method of 'foundation construction → component installation → joint treatment → decoration' is adopted. During the foundation construction stage, it is necessary to ensure that the characteristic value of the foundation bearing capacity is ≥180kPa. Weak soil layers need to be replaced with graded sand and gravel and compacted in layers. During the main body installation stage, the structural assembly is completed through module lifting, temporary fixation, and joint grouting. The decoration stage covers waterproofing, pipeline installation, and interior and exterior decoration, with a total construction period of about 75 days.

Manufacturing enterprises and cases: China Railway Assembly Xinjiang Construction and Development Co., Ltd. has built more than 100 sets of herdsmen settlement houses in Bayingou through factory-prefabricated component technology. Currently, it is producing at a rate of 15 sets per day, with 30 teams working simultaneously. In terms of price, the price per square meter of cement prefabricated houses in Xinjiang ranges from 100 yuan to 600 yuan, depending on the decoration company, decoration materials, and requirements.