Wushan Container House Construction

Admin 15 de septiembre de 2026

The construction of container houses in Wushan needs to combine project requirements, regulatory standards, and local resources, with a focus on key aspects such as design, production, installation, and compliance.

I. Clarify Project Requirements and Planning
The construction of container houses should determine design specifications based on the project's purpose (such as construction site dormitories, temporary offices, commercial outlets, etc.). The standard container size is 3m×6m, with a typical floor height of 2.6m-2.8m. The materials are mostly weathering steel or fire-resistant rock wool panels, featuring modular assembly, rapid deployment, and mobile turnover characteristics. For example, Chongqing Delaisi Container Co., Ltd. can provide customized services, including residential containers, special-shaped containers, and modular homestays, to meet different scenario requirements. Before construction, it is necessary to plan the site layout, considering terrain, climate, and functional zoning to ensure efficient space utilization.

II. Select Compliant Suppliers and Products
Prioritize local suppliers with production qualifications and extensive experience to reduce transportation costs and ensure prompt after-sales response. As the first professional residential container enterprise in Chongqing, Chongqing Delaisi Container Co., Ltd. has over a decade of R&D and production experience, with products covering fields such as housing construction, subways, and municipal engineering. Its container houses use fire-resistant rock wool panels and steel structural frames, meeting safety and environmental protection standards. It also offers various models such as leasing, purchase, and full-package customization, which can flexibly adapt to project budgets.

III. Follow Construction Regulations and Safety Standards
The installation of container houses must comply with the "Modular Building Technical Standards" and local building regulations, with a focus on controlling aspects such as foundation construction, structural connections, and fire and moisture prevention. For example, the foundation should be flat and solid, using concrete pouring or steel bracket fixation; high-strength bolts should be used for connections between containers to ensure overall stability; electrical wiring should be concealed and equipped with leakage protection devices; exterior walls should be waterproofed, and roofs should have drainage slopes. Additionally, safety and quality inspection posts should be set up to implement special plan demonstrations and on-site supervision for high-risk aspects such as deep excavations and high-formwork.

IV. Handle Approval Procedures and Compliance Acceptance
Before construction, it is necessary to submit design plans, construction drawings, and supplier qualification documents to the Wushan County Housing and Urban-Rural Development Commission or relevant regulatory authorities to apply for temporary building permits. After project completion, joint acceptance by supervision, construction, and design units should be organized, focusing on checking structural safety, fire protection facilities, and environmental protection indicators to ensure compliance with policies such as the "Chongqing Housing Rental Contract Online Filing and Registration Management Measures." For example, the construction supervision of the Wushan Xingang Equipment Industrial Park project should cover the entire process of civil engineering, steel structures, and water and electricity, with an estimated construction and installation cost of 140 million yuan. Its supervision unit should have Class A qualifications for housing construction engineering.

V. Optimize Plans by Referencing Local Cases
The experience of the Wushan County Agricultural Product Processing Center project can be drawn upon to improve efficiency through methods such as inverted scheduling, visual scheduling, and optimizing process衔接 (process connection). The project team reasonably allocated resources and implemented "daily guarantee for the week, weekly guarantee for the month" plan control in response to issues such as complex mountainous terrain and narrow sites, ultimately completing the main structure封顶 ahead of schedule. Additionally, the successful application of modular buildings in overseas projects (such as a 50% reduction in the construction period of the Papua New Guinea MRDC Hotel project) has also verified their advantages of saving time, money, and being low-carbon, providing references for the construction of container houses in Wushan.