The toilet sewer pipe can be relocated, but the appropriate method must be chosen based on the relocation distance, and construction specifications must be strictly followed.

I. Short-Distance Relocation (Within 40 cm)

  1. Use a Special Relocation Device:

    • Flat or round relocation pipes: Suitable for short-distance adjustments, a slope of 1%-2% (i.e., a drop of 1-2 cm per meter) must be maintained to ensure smooth sewage discharge.
    • Reduce the number of bends: Excessive bends can easily cause blockages. It is recommended to keep the pipes as straight as possible and avoid right-angle turns.
  2. Toilet Relocation Device (Offset Device):

    • Suitable for solving the problem of misalignment between the sewage outlet and the toilet position. Common relocation distances range from 5-10 cm, and can reach up to 15 cm in special cases.
    • Choose a relocation device that matches the pipe diameter (usually 110mm or 75mm) and ensure that the joints are tightly sealed after installation.

II. Long-Distance Relocation (Over 40 cm)

  1. Raise the Floor and Relay the Pipes:

    • The entire floor needs to be raised by about 20 cm to provide installation space for the new pipes while ensuring the required slope.
    • When relaying the pipes, it is recommended to use PVC or cast iron pipes, and avoid using flexible pipes (such as corrugated pipes) to prevent deformation.
  2. Use a Sewage Lifting Pump for Drainage Assistance:

    • If space is limited and the floor cannot be raised, a sewage lifting pump can be installed to transport the sewage to the main sewer pipe using pump force.
    • Regular maintenance of the lifting pump is required to prevent motor failure or blockages.

III. Construction Precautions

  1. Pipe Sealing:

    • All joints must be sealed using special glue or hot-melt connections to ensure no leakage.
    • Avoid using raw material tape or ordinary tape, as they are prone to aging and detachment over long-term use.
  2. Protect the Building Structure:

    • When drilling holes or cutting slots, avoid steel bars and load-bearing structures to prevent damage to the building's safety.
    • If the pipes need to pass through the floor slab, install waterproof sleeves around the pipes and redo the waterproof layer.
  3. Waterproofing and Closed Water Test:

    • After relocation, the waterproof layer must be redone, especially at the joints between the pipes and the floor slab. Apply waterproof coating and lay non-woven fabric for reinforcement.
    • After construction is completed, conduct a 48-hour closed water test to observe whether there is any leakage on the ceiling below, and confirm that everything is correct before proceeding with further renovation.

Summary: The relocation of toilet sewer pipes requires choosing a plan based on the distance. For short distances, relocation devices are preferred, while for long distances, the floor needs to be raised or a lifting pump is required. During construction, attention must be paid to sealing, waterproofing, and structural safety to avoid rework later.