Volver al blog
Artículo
Toilet Mobile Partition Installation Video Translation
Admin 06 de octubre de 2026
Currently, there is no direct installation video specifically for toilet mobile partitions, but you can refer to installation videos for bathroom partitions to understand the installation methods. Here are some reference installation videos for bathroom partitions and related key points:

Ya Zhijie Bathroom Partition Antibacterial Board Installation Tutorial
- Material Preparation: Antibacterial board is a commonly used material with properties such as water resistance, wear resistance, and corrosion resistance. Before installation, prepare tools and materials such as antibacterial board, connectors, screws, an electric drill, and a level.
- Measurement and Positioning: Use a level and measuring tools to accurately measure the space dimensions of the bathroom, determine the installation position and height of the partition, and mark them on the floor and walls.
- Frame Installation: Based on the measurement results, install the frame structure of the partition, ensuring that the frame is level, vertical, and sturdy. The installation quality of the frame directly affects the stability and service life of the partition.
- Antibacterial Board Installation: Install the antibacterial board onto the frame according to the design requirements, and fix it with connectors and screws. During installation, ensure that the joints between the boards are flat and tight to avoid gaps.
Public Bathroom Partition Installation Tutorial
- Foundation Preparation: Before installation, perform foundation treatment on the floor and walls of the bathroom to ensure that the surfaces are flat, clean, and free of debris. If the floor or walls are uneven, leveling treatment is required.
- Column Installation: Install the partition columns according to the design requirements. The columns should be installed firmly, and their verticality should meet the standards to ensure the overall stability of the partition.
- Beam and Door Frame Installation: After the column installation is complete, install the beams and door frames. The installation of the beams and door frames should be level and vertical, and their connections with the columns should be tight.
- Partition Board and Door Installation: Install the partition boards between the beams and columns and fix them with screws or connectors. Then install the partition doors and adjust their opening and closing smoothness and sealing performance.
Bathroom Partition Sliding Door Installation Tutorial (Fixed without a Single Expansion Screw)
- Special Installation Method: This tutorial introduces an installation method that does not use expansion screws. It usually adopts special connectors and fixing methods, such as using adhesive or snap-in methods to fix the partition to the walls and floor.
- Installation Steps: First, install the track, ensuring that it is level and sturdy. Then install the sliding door onto the track, adjust the door's position and sliding smoothness. Finally, install the door stop and sealing strip to improve the partition's sealing performance and user comfort.
Relacionados




