There are practices related to prefabricated houses in Suining, and assembled prefabricated houses offer numerous advantages.

I. High Construction Efficiency
Assembled buildings break down houses into multiple 'box-like' components, with over 90% of the work completed in factories. For example, components such as walls, stairs, and ceilings are prefabricated and then transported to the site. Workers can complete the construction of the main structure of the house through precise hoisting and assembly. Taking the practice of Xuzhou Aoxing New Building Materials Co., Ltd. as an example, the entire main structure of the house can be built in just three days, significantly shortening the construction period and demonstrating a marked improvement in efficiency compared to traditional construction methods.

II. Strong Earthquake Resistance
Prefabricated houses employ a frame structure composed of steel beams and columns, which offers extremely strong earthquake resistance. In the event of natural disasters such as earthquakes, they can better withstand seismic forces, reducing the risk of house collapse and providing a safer living environment for occupants.

III. Outstanding Environmental Advantages
On-site construction generates no brick debris, dust, or noise. Pipes and wires are pre-installed in the prefabricated components, reducing the need for on-site trenching and wiring, thereby significantly decreasing construction pollution. This not only helps protect the environment around the construction site but also aligns with the development concept of green buildings, playing a crucial role in promoting the sustainable development of the construction industry.

IV. Guaranteed House Quality
Walls made from new materials are warm in winter and cool in summer, providing insulation and soundproofing. They also address the issue of traditional exterior wall insulation layers being prone to detachment. The insulation material is cast integrally with the main structure, ensuring it will never hollow out or detach over its lifetime, effectively extending the service life of the house. Additionally, in projects such as the affordable housing section of the first phase of the development around the second primary school in the new urban area by China Construction Second Engineering Bureau Jiangsu Branch, assembled shear wall structures are used, along with 'three-board' constructions of composite slabs, prefabricated stairs, and ALC panels. The exterior walls employ self-insulating blocks and composite integrated insulation non-removable templates, with extensive use of high-strength steel bars. These quality control measures further optimize the construction process and enhance the overall quality of the houses.