Volver al blog
Artículo

Shenzhen Prefabricated Housing Solution

Admin 18 de septiembre de 2026

The Shenzhen Prefabricated Housing Solution primarily adopts a modular construction model, combining factory prefabrication with on-site assembly to achieve efficient, environmentally friendly, and controllable building production.

Construction Model

The core of Shenzhen's prefabricated housing lies in modular design, where buildings are divided into independent modules (such as ceilings, floors, walls, and plumbing and electrical systems). These modules are prefabricated on factory assembly lines and then transported to construction sites for assembly. This “building block” approach significantly reduces on-site workloads. For example, the three-dimensional factory at CSCEC Hailong Smart Construction Industrial Park can manufacture components like ceilings, walls, and waterproof layers, while CSCEC Integrated Construction's smart factory achieves full-process production of profile cutting, welding, and grinding through automated production lines. The production of corner columns for temporary steel modules even achieves full-process automation, with a finished product ready every 3 minutes and 30 seconds.

Production Capacity and Technological Innovation

Shenzhen boasts two core production bases:

  1. CSCEC Hailong Smart Construction Industrial Park: With an annual delivery capacity of 20,000 to 30,000 modules, it reduces dust and scaffolding use on traditional construction sites through its three-dimensional factory model.
  2. CSCEC Integrated Construction Intelligent Manufacturing (Shenzhen) Co., Ltd.: Its smart factory is equipped with the most intelligent modular flexible production line in China. The 200-meter permanent steel module production line features 28 independent workstations, integrating 10 intelligent welding robots and over 40 sets of specialized equipment. It can produce steel modules of different sizes, such as overseas student dormitories and camp barracks, as needed, with top and bottom frame processing taking only 15 minutes.

Advantages and Characteristics

  1. Short Construction Period: The construction cycle is reduced by over 60% compared to traditional methods. For instance, a public housing project in Shenzhen, Guangdong, assembled 6,028 concrete modules, compressing the completion and delivery time from 2.5-3 years to just 1 year.
  2. Controllable Quality: Factory prefabrication controls errors with millimeter-level precision, ensuring stable welding and finishing quality and avoiding uncertainties associated with on-site manual work.
  3. Energy Efficiency and Environmental Protection: Reduced on-site construction leads to significant decreases in dust, noise, and construction waste, meeting green building standards.
  4. Convenient Maintenance: Modular design extends to each component, facilitating easy maintenance and updates in the future.

Overseas Expansion Advantages

Shenzhen's prefabricated housing leverages the “port-industry linkage” model to expand into international markets. The smart factory of CSCEC Integrated Construction is just 20 kilometers from Xiaomo International Logistics Port, enabling a complete chain of “Shenzhen R&D + Shenshan manufacturing + direct port shipping.” Since this year, its modular buildings have been shipped in three batches via direct voyages from Xiaomo Port to Oceania, highlighting competitive advantages in fast transportation and low damage rates.