Shandong Prefabricated Housing Project
The Shandong Prefabricated Housing Project encompasses multiple project types, involving production, manufacturing, construction, and other aspects. The following provides an introduction from different perspectives:

Production Projects: The Shandong Prefabricated Concrete Modular Housing Production Project is a newly constructed project with non-government investment. With 120 million yuan in funding already in place, it is in the completion and operation phase and procures equipment domestically. Construction is expected to commence in the first quarter of 2025 and be completed in the fourth quarter of 2025.
Manufacturing Enterprise Operations: Shandong Lanjing Construction Engineering Co., Ltd. is a professional manufacturer of steel structures and prefabricated housing, offering comprehensive one-stop customized services, including design, manufacturing, installation, overseas project supervision, and after-sales support. The company provides steel structure buildings for clients in fields such as oil and gas, mining, energy, infrastructure, and construction projects. It also supplies prefabricated housing used as temporary worker accommodations during project construction, serving as dormitories, on-site offices, kitchens, dining halls, showers, and restrooms in worker camps.
Construction Plan (Taking the Project in Licheng District, Jinan City as an Example):
- Project Overview: Located in Licheng District, Jinan City, Shandong Province, the project has a total construction area of approximately 28,000 square meters, comprising 12 three-story prefabricated assembled residential buildings and supporting ancillary facilities. The building structure is an assembled monolithic shear wall structure with a prefabrication rate of 65%. The main prefabricated components include prefabricated shear wall panels, prefabricated composite floor slabs, prefabricated stair treads, prefabricated air conditioning panels, and prefabricated balcony panels. The project has a total planned duration of 180 calendar days, with a planned start date of March 1, 2026, and a completion date of August 27, 2026.
- Construction Deployment: A prefabricated building construction management team centered around the project manager will be established, with clear job responsibilities defined for each role. The construction phases and schedule include construction preparation, foundation construction, prefabricated component installation, cast-in-place structure construction, decoration, and finishing stages, each with specific time nodes and main tasks. In terms of equipment, two QY50K5C truck cranes will be used for lifting prefabricated components, one QTZ80 tower crane for vertical transportation of prefabricated components and materials, and several specialized grouting equipment for grouting operations.