Prefabricated Wall Construction Plan
Admin 18 de septiembre de 2026
The prefabricated wall construction plan for houses mainly includes three types: custom-made prefabricated houses, prefabricated wall sleeves, and prefabricated assembly lifting. The specific content is as follows:

I. Custom-Made Prefabricated House Construction Plan
- Construction Preparation
- Site Preparation: Level the site, set up temporary facilities (such as offices and warehouses), and ensure smooth traffic.
- Personnel Preparation: Form a professional team (project managers, technicians, etc.) and conduct construction technical training.
- Material Preparation: Purchase prefabricated components (walls, floors, etc.) and auxiliary materials (steel bars, cement, sand and gravel) that meet design standards.
- Construction Process
- Foundation Construction: Level and compact the foundation, and pour a concrete foundation.
- Component Transportation and Storage: Use specialized tools for transportation and stack them in the designated area in order.
- Component Assembly: Install walls, roofs, etc., in the design order, using bolts or welding connections to ensure firmness.
- Decoration Works: Complete the decoration of walls, floors, and ceilings, and install doors, windows, stairs, and other facilities.
- Quality Control
- Strictly inspect the quality of raw materials, construct according to process standards, and ensure that concealed works pass acceptance.
- Schedule Arrangement
- The total cycle is approximately 85 days, including foundation (15 days), transportation (5 days), assembly (20 days), decoration (30 days), and acceptance (5 days).
II. Prefabricated Wall Sleeve Construction Plan
- Project Overview
- Suitable for high-rise residential buildings (such as 18-story shear wall structures), sleeves are used for wires and pipes to pass through walls.
- Construction Preparation
- Technical Preparation: Familiarize with the drawings, clarify the position and specifications of the sleeves, and organize technical disclosures.
- Material Preparation: Select sleeves that meet the requirements and prepare cement, sand and gravel, and steel bars.
- Equipment Preparation: Equip with cutting machines, welding machines, vibrators, and other tools.
- Construction Process
- Process: Positioning → Installation → Fixing → Concrete Pouring → Curing.
- Key Points: Ensure accurate positioning and firm installation of the sleeves, pour concrete densely without honeycomb pits, and cure according to specifications.
- Quality Control
- Focus on monitoring the quality of sleeves and steel bars, and strictly control the positioning, installation, and pouring links.
III. Prefabricated Assembly Lifting Construction Plan
- Process Flow
- Preparation → Lifting → Positioning → Installation of Inclined Supports → Adjustment → Fixing of Corner Codes → Concrete Pouring → Gluing and Finishing.
- Preparation Matters
- Steel Bar Positioning: Precisely process positioning steel bars to ensure alignment of inserted steel bars with columns.
- Inclined Support Embedded Parts: Position and pre-bury bolts according to the drawings and mark them with chalk lines.
- Lifting Key Points
- Use modular lifting beams, select appropriate lifting points, and inspect the appearance and connections after lifting.
- When lifted to 600mm above the working layer, use a tag line to control the descent speed.
- Inclined Support Installation
- Connect the inclined support rods to the wall panels and cast-in-place slabs through bolts, and temporarily fix them after initial adjustment.
- Precise Adjustment
- Use long and short inclined support rods to adjust the verticality, levelness, and elevation according to the control lines to ensure that the indicators meet the standards.