Renovation Plan for Prefabricated Structure Houses
Admin 18 de septiembre de 2026
The renovation of prefabricated structure houses should be carried out comprehensively, taking into account policy guidance, regional characteristics, and the actual conditions of the houses, covering aspects such as demolition, compensation, renovation content, and technological upgrades.

I. Renovation Directions under National Policy Guidance
The new policy in 2025 specifies three types of houses for priority demolition:
- Dangerous houses with damaged main structures: Houses identified as D-grade dangerous houses by professional institutions (e.g., foundation settlement exceeding 5 cm, cracks in load-bearing walls wider than 1 mm, and seismic resistance below 70% of the current standard) need to be demolished and rebuilt.
- Houses vulnerable to natural disasters: Houses with seismic resistance below 70% of the current standard or those prone to damage during floods should be included in the renovation scope.
- Houses affecting urban planning: Residential buildings located within the planning areas of major infrastructure projects such as subways and viaducts need to be vacated.
Four compensation options are provided:
- Monetary compensation: Not less than 110% of the market price of surrounding commercial housing;
- Property rights exchange: For example, residential buildings in Handan are exchanged at a ratio of 1:1.1, with a maximum of 1:1.2 for houses on homesteads, and a guaranteed area is provided for those with less than 30 square meters per person;
- Housing voucher resettlement: Select resettlement housing through the housing voucher system;
- Other options: Other compensation forms are supplemented according to local policies.
II. Targeted Measures for Renovation in Sichuan
Sichuan aims for "safety, greenness, and livability" and focuses on renovating urban prefabricated houses built before the end of 2000 that have structural hazards or functional defects:
- Inspection and assessment: Establish an electronic file for each house, known as "one file per house," through a five-step method of "data collection—on-site inspection—structural testing—seismic assessment—comprehensive evaluation" to clarify the renovation priority.
- Renovation content:
- Structural safety: Reinforce key parts such as prefabricated panel connection nodes and load-bearing walls;
- Waterproofing and moisture resistance: Strengthen the waterproof layers of roofs and exterior walls and the moisture-proof treatment of basements in response to Sichuan's humid climate;
- Energy-saving and insulation: Add exterior wall insulation layers and replace energy-saving doors and windows;
- Equipment renewal: Replace aging water and electricity pipelines and add fire protection facilities;
- Age-friendly renovation: Install elevators and barrier-free access and optimize the anti-slip design of bathrooms.
III. General Renovation Suggestions
- Comprehensive inspection: Commission professional institutions to detect issues such as wall cracks, steel bar corrosion, and foundation settlement to provide data support for renovation.
- Functional upgrading: Add elevators as needed, optimize spatial layout (e.g., remove non-load-bearing walls to expand the living room area), and improve sound insulation performance (e.g., add sound insulation felt).
- Technological upgrading: Adopt prefabricated decoration technology to shorten the construction period and facilitate later maintenance through modular wall panels and integrated kitchens; promote green technologies such as solar photovoltaic panels and rainwater harvesting systems.