[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"global_setting:es":3,"categories:es":20,"api:\u002Farticles:es:{\"sort\":\"id:desc\",\"pagination[withCount]\":false,\"filters[slug][$eq]\":\"prefabricated-panel-house-construction-schedule\",\"pagination[page]\":1,\"pagination[pageSize]\":1,\"populate[cover]\":true,\"populate[category]\":true}":198,"blog-prev:es:prefabricated-panel-house-construction-schedule:2026-09-18T16:06:13.644Z":241,"blog-next:es:prefabricated-panel-house-construction-schedule:2026-09-18T16:06:13.644Z":245,"api:\u002Farticles:es:{\"sort\":\"publishedAt:desc\",\"pagination[withCount]\":false,\"fields[0]\":\"title\",\"fields[1]\":\"slug\",\"fields[2]\":\"excerpt\",\"fields[3]\":\"publishedAt\",\"fields[4]\":\"createdAt\",\"populate[cover]\":true,\"filters[slug][$ne]\":\"prefabricated-panel-house-construction-schedule\",\"pagination[page]\":1,\"pagination[pageSize]\":4}":254},{"data":4,"meta":19},{"id":5,"documentId":6,"siteName":7,"siteTitle":8,"siteDescription":9,"email":10,"phone":11,"whatsapp":12,"createdAt":13,"updatedAt":14,"publishedAt":15,"locale":16,"address":17,"siteKeywords":18},48,"oa8f3tu3m17iipzazrxrmufk","YiHang Cross-Border","Planta de viviendas prefabricadas Yihang _ Contenedores habitables _ Baños móviles _ Planta integral de viviendas rápidas y fáciles de ensamblar","Yihang Prefabricated Houses es una fábrica profesional de producción de viviendas prefabricadas integral, especializada en contenedores habitables, casas modulares rápidas, baños móviles y otros productos. Ofrecemos suministro directo desde la fábrica, soportamos producción personalizada, montaje rápido y reutilización, siendo ampliamente aplicable en escenarios como construcciones temporales en obras, oficinas al aire libre, alojamiento provisional y equipamiento de zonas turísticas. Con calidad confiable y eficiencia en plazos, atendemos proyectos personalizados de viviendas prefabricadas tanto nacionales como internacionales.","xianglele@ehang-cross.com","+8619092593611 ","8619092593611 ","2026-08-24T14:22:44.236Z","2026-09-21T15:23:46.721Z","2026-09-21T15:23:46.774Z","es","Zhejiang, China","Fábrica de viviendas prefabricadas para navegación, contenedores de vivienda, baños móviles, viviendas simples de ensamblaje rápido",{},{"data":21,"meta":193},[22,39,47,55,63,78,86,94,102,110,150],{"id":23,"documentId":24,"name":25,"slug":26,"description":27,"createdAt":28,"updatedAt":28,"publishedAt":29,"locale":16,"parent":30,"children":38,"cover":27},434,"jgl16pgiujilzypxh7w1dvsf","Casas Contenedor Desmontables y de Paquete Plano","flat-pack-and-detachable-container-houses",null,"2026-08-31T14:40:02.419Z","2026-08-31T14:49:28.000Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},551,"r55sewcg5jmiwkpom4lipxas","Casas Contenedor","container","2026-08-31T14:34:58.588Z","2026-09-08T15:41:26.909Z","2026-09-08T15:41:27.487Z",[],{"id":40,"documentId":41,"name":42,"slug":43,"description":27,"createdAt":44,"updatedAt":44,"publishedAt":29,"locale":16,"parent":45,"children":46,"cover":27},436,"rgxh10ucmzziz0nsnhk2hoeq","casa de contenedor plegable","foldable-folding-container-houses","2026-08-31T14:40:03.259Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},[],{"id":48,"documentId":49,"name":50,"slug":51,"description":27,"createdAt":52,"updatedAt":52,"publishedAt":29,"locale":16,"parent":53,"children":54,"cover":27},438,"oc9q3a05evd1yqknsdqqnr7d","casa contenedor escalable","expandable-container-houses","2026-08-31T14:40:04.037Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},[],{"id":56,"documentId":57,"name":58,"slug":59,"description":27,"createdAt":60,"updatedAt":60,"publishedAt":29,"locale":16,"parent":61,"children":62,"cover":27},440,"tjabq1gzspxnzftyarxqh5m6","contenedores ISO para transporte y almacenamiento","iso-shipping-storage-containers","2026-08-31T14:40:04.874Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},[],{"id":64,"documentId":65,"name":66,"slug":67,"description":27,"createdAt":68,"updatedAt":68,"publishedAt":29,"locale":16,"parent":69,"children":77,"cover":27},442,"mllynk5uc89sod5c8ndiqd7j","Baños portátiles de panel sándwich","sandwich-panel-portable-toilets","2026-08-31T14:40:05.654Z",{"id":70,"documentId":71,"name":72,"slug":73,"description":72,"createdAt":74,"updatedAt":75,"publishedAt":76,"locale":16},479,"fu8tuiis68jmi0i5iokdq06e","Baños Portátiles","mobile-toilet","2026-08-31T14:35:00.359Z","2026-08-31T14:47:54.494Z","2026-08-31T14:47:54.975Z",[],{"id":79,"documentId":80,"name":81,"slug":82,"description":27,"createdAt":83,"updatedAt":83,"publishedAt":29,"locale":16,"parent":84,"children":85,"cover":27},456,"ovwz6cyf18poazkrojb8r4mm","Cápsulas Espaciales y Cabañas Apple","space-capsule-houses-apple-cabins","2026-08-31T14:40:50.763Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},[],{"id":87,"documentId":88,"name":89,"slug":90,"description":27,"createdAt":91,"updatedAt":91,"publishedAt":29,"locale":16,"parent":92,"children":93,"cover":27},458,"fcg0r2nn01zvrruk7snqwji2","Casas Modulares y Prefabricadas","modular-homes-other-prefab-houses","2026-08-31T14:40:51.361Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16},[],{"id":95,"documentId":96,"name":97,"slug":98,"description":27,"createdAt":99,"updatedAt":99,"publishedAt":29,"locale":16,"parent":100,"children":101,"cover":27},460,"czl0ibqkzm8vygbfe5qpo2l1","Baños Portátiles de HDPE","hdpe-plastic-portable-toilets","2026-08-31T14:40:51.915Z",{"id":70,"documentId":71,"name":72,"slug":73,"description":72,"createdAt":74,"updatedAt":75,"publishedAt":76,"locale":16},[],{"id":103,"documentId":104,"name":105,"slug":106,"description":27,"createdAt":107,"updatedAt":107,"publishedAt":29,"locale":16,"parent":108,"children":109,"cover":27},462,"tec69y18rtmmv2tp4tb3y703","Baños Móviles de Estructura Soldada","welded-structure-mobile-toilets","2026-08-31T14:40:52.510Z",{"id":70,"documentId":71,"name":72,"slug":73,"description":72,"createdAt":74,"updatedAt":75,"publishedAt":76,"locale":16},[],{"id":70,"documentId":71,"name":72,"slug":73,"description":72,"createdAt":74,"updatedAt":75,"publishedAt":76,"locale":16,"parent":27,"children":111,"cover":115},[112,113,114],{"id":64,"documentId":65,"name":66,"slug":67,"description":27,"createdAt":68,"updatedAt":68,"publishedAt":29,"locale":16},{"id":95,"documentId":96,"name":97,"slug":98,"description":27,"createdAt":99,"updatedAt":99,"publishedAt":29,"locale":16},{"id":103,"documentId":104,"name":105,"slug":106,"description":27,"createdAt":107,"updatedAt":107,"publishedAt":29,"locale":16},{"id":116,"documentId":117,"name":118,"alternativeText":27,"caption":27,"focalPoint":27,"width":119,"height":119,"formats":120,"hash":144,"ext":122,"mime":125,"size":145,"url":146,"previewUrl":27,"provider":147,"provider_metadata":27,"createdAt":148,"updatedAt":148,"publishedAt":149},1225,"e8w1zqavtqaq3afulj8t4efj","H5a0c7cf6b7bb438da832dfc28e6b87c0X.jpg",800,{"small":121,"medium":130,"thumbnail":137},{"ext":122,"url":123,"hash":124,"mime":125,"name":126,"path":27,"size":127,"width":128,"height":128,"sizeInBytes":129},".jpg","https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851.jpg","small_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851","image\u002Fjpeg","small_H5a0c7cf6b7bb438da832dfc28e6b87c0X.jpg",23.63,500,23630,{"ext":122,"url":131,"hash":132,"mime":125,"name":133,"path":27,"size":134,"width":135,"height":135,"sizeInBytes":136},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851.jpg","medium_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851","medium_H5a0c7cf6b7bb438da832dfc28e6b87c0X.jpg",42.65,750,42649,{"ext":122,"url":138,"hash":139,"mime":125,"name":140,"path":27,"size":141,"width":142,"height":142,"sizeInBytes":143},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851.jpg","thumbnail_H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851","thumbnail_H5a0c7cf6b7bb438da832dfc28e6b87c0X.jpg",4.19,156,4188,"H5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851",43.48,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002FH5a0c7cf6b7bb438da832dfc28e6b87c0_X_3056827851.jpg","strapi-provider-upload-aliyun-oss","2026-08-23T12:40:07.717Z","2026-08-23T12:40:07.718Z",{"id":31,"documentId":32,"name":33,"slug":34,"description":33,"createdAt":35,"updatedAt":36,"publishedAt":37,"locale":16,"parent":27,"children":151,"cover":158},[152,153,154,155,156,157],{"id":23,"documentId":24,"name":25,"slug":26,"description":27,"createdAt":28,"updatedAt":28,"publishedAt":29,"locale":16},{"id":40,"documentId":41,"name":42,"slug":43,"description":27,"createdAt":44,"updatedAt":44,"publishedAt":29,"locale":16},{"id":48,"documentId":49,"name":50,"slug":51,"description":27,"createdAt":52,"updatedAt":52,"publishedAt":29,"locale":16},{"id":56,"documentId":57,"name":58,"slug":59,"description":27,"createdAt":60,"updatedAt":60,"publishedAt":29,"locale":16},{"id":79,"documentId":80,"name":81,"slug":82,"description":27,"createdAt":83,"updatedAt":83,"publishedAt":29,"locale":16},{"id":87,"documentId":88,"name":89,"slug":90,"description":27,"createdAt":91,"updatedAt":91,"publishedAt":29,"locale":16},{"id":159,"documentId":160,"name":161,"alternativeText":27,"caption":27,"focalPoint":27,"width":162,"height":162,"formats":163,"hash":189,"ext":122,"mime":125,"size":190,"url":191,"previewUrl":27,"provider":147,"provider_metadata":27,"createdAt":192,"updatedAt":192,"publishedAt":192},1223,"ammcra78h5i6ts27xrts3se5","He0540c3d9e0c47829bceb8aad3dcc0ccY.jpg",1920,{"large":164,"small":171,"medium":177,"thumbnail":183},{"ext":122,"url":165,"hash":166,"mime":125,"name":167,"path":27,"size":168,"width":169,"height":169,"sizeInBytes":170},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Flarge_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61.jpg","large_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61","large_He0540c3d9e0c47829bceb8aad3dcc0ccY.jpg",215.13,1000,215132,{"ext":122,"url":172,"hash":173,"mime":125,"name":174,"path":27,"size":175,"width":128,"height":128,"sizeInBytes":176},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61.jpg","small_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61","small_He0540c3d9e0c47829bceb8aad3dcc0ccY.jpg",64.11,64109,{"ext":122,"url":178,"hash":179,"mime":125,"name":180,"path":27,"size":181,"width":135,"height":135,"sizeInBytes":182},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61.jpg","medium_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61","medium_He0540c3d9e0c47829bceb8aad3dcc0ccY.jpg",131.27,131270,{"ext":122,"url":184,"hash":185,"mime":125,"name":186,"path":27,"size":187,"width":142,"height":142,"sizeInBytes":188},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61.jpg","thumbnail_He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61","thumbnail_He0540c3d9e0c47829bceb8aad3dcc0ccY.jpg",7.14,7138,"He0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61",592.01,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002FHe0540c3d9e0c47829bceb8aad3dcc0cc_Y_86c1fb2a61.jpg","2026-08-23T08:54:19.423Z",{"pagination":194},{"page":195,"pageSize":196,"pageCount":195,"total":197},1,100,11,{"data":199,"meta":239},[200],{"id":201,"documentId":202,"title":203,"slug":204,"excerpt":27,"createdAt":205,"updatedAt":205,"publishedAt":206,"locale":207,"content":208,"seo_title":27,"seo_description":27,"seo_keywords":27,"isRecommend":209,"cover":210,"category":27},365940,"b1svp8e3vyqxhd4jq7xpjmtj","Construction Schedule of Prefabricated Panel Houses","prefabricated-panel-house-construction-schedule","2026-09-18T16:06:13.620Z","2026-09-18T16:06:13.644Z","en","**The construction schedule of prefabricated panel houses is influenced by multiple stages, including production, transportation, installation, and special processes. The overall construction period typically ranges from 2 to 4 months, depending on the project scale, process selection, and site conditions.**\n\n![](https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fgallery\u002Fimport_1788448991114_1p9hmu3r_88fa9b622f.jpg)\n\n### 1. Production Cycle\nAs the core component of the house, the production cycle of prefabricated panels directly affects the overall progress. **Generally, the production cycle for most standard prefabricated panels is 20-40 days**, depending on the panel specifications (such as length, thickness, and load-bearing capacity) and the manufacturer's production capacity. For example, standardized residential prefabricated floor slabs or wall panels can have their production cycle shortened to about 25 days if the manufacturer has advanced equipment and a mature production line. However, customized or special-function prefabricated panels (such as seismic structural panels or thermal insulation composite panels) may require more time for mold adjustment, material proportioning, and quality inspection.\n\n### 2. Transportation Time\nThe efficiency of the transportation stage is constrained by the distance to the construction site and traffic conditions. **Short-distance urban transportation (e.g., from the city center to the suburbs) typically takes 2-3 days**. When road conditions are good and there are no traffic restrictions, it is possible to achieve 'production on the same day and arrival on the next day'. **Inter-provincial or remote area transportation may extend to several weeks**, especially in mountainous, plateau, or harsh weather regions, where road capacity, vehicle scheduling, and weather impacts must be considered. For example, transporting from a prefabricated panel production base in East China to a construction site in the mountainous areas of Southwest China may double the transportation time due to winding mountain roads or landslides during the rainy season.\n\n### 3. Installation Time\nThe standardized design of prefabricated panels significantly shortens the on-site installation cycle. **Installation itself only takes a few days to a couple of weeks**, as workers only need to hoist, fix, and assemble the uniformly sized components according to the design drawings at the reserved foundation positions. However, if subsequent processes (such as exterior wall decoration, interior decoration, and landscaping) are included, **the overall wall-raising time for the building is about 1-2 months**, depending on the number of floors (high-rise buildings require layer-by-layer installation), structural complexity (such as the need for additional positioning for irregular components), and the efficiency of the construction team. For example, the installation of prefabricated panels for a 6-story residential building may be completed in 10 days, but the overall delivery may take about 60 days.\n\n### 4. Impact of Special Processes\nThe adoption of new processes can further compress the construction period. **Taking raft foundation construction as an example, using prefabricated panel formwork instead of traditional brick formwork can shorten the foundation cycle by 20%-30%**. For instance, a commercial complex project in Beijing reduced the originally planned 28-day foundation construction to 22 days through the use of prefabricated concrete formwork technology, while also reducing dust and noise pollution from on-site wet operations (such as bricklaying and plastering). In addition, modular prefabrication technology (such as integrated bathroom and kitchen units) enables parallel construction of 'installing the main structure while decorating the interior', further shortening the total construction period.\n\n### 5. Overall Construction Period Case Reference\nTaking wooden house construction as an example, if the factory prefabrication method is adopted, **the on-site installation of the main structure (wooden frame or integrated prefabricated wooden panel assembly) typically takes only 2-4 weeks**. Adding foundation construction, interior and exterior decoration, and acceptance processes, **the overall period is roughly 2-4 months**. This data indicates that the工期 (construction period) advantage of prefabricated panel houses is more significant in small and medium-sized projects, while super high-rise or complex structural buildings may experience extended periods due to factors such as technical coordination and approval processes.",false,{"id":211,"documentId":212,"name":213,"alternativeText":214,"caption":27,"focalPoint":27,"width":119,"height":119,"formats":215,"hash":234,"ext":122,"mime":125,"size":235,"url":236,"previewUrl":27,"provider":147,"provider_metadata":27,"createdAt":237,"updatedAt":237,"publishedAt":238},13374,"dm6gt8n9r1o4fknu70pay4zk","import_1788448991114_1p9hmu3r_88fa9b622f.jpg","BaojiContainer House",{"small":216,"medium":222,"thumbnail":228},{"ext":122,"url":217,"hash":218,"mime":125,"name":219,"path":27,"size":220,"width":128,"height":128,"sizeInBytes":221},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573.jpg","small_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573","small_import_1788448991114_1p9hmu3r_88fa9b622f.jpg",27.34,27338,{"ext":122,"url":223,"hash":224,"mime":125,"name":225,"path":27,"size":226,"width":135,"height":135,"sizeInBytes":227},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573.jpg","medium_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573","medium_import_1788448991114_1p9hmu3r_88fa9b622f.jpg",59.33,59327,{"ext":122,"url":229,"hash":230,"mime":125,"name":231,"path":27,"size":232,"width":142,"height":142,"sizeInBytes":233},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573.jpg","thumbnail_import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573","thumbnail_import_1788448991114_1p9hmu3r_88fa9b622f.jpg",3.12,3121,"import_1788448991114_1p9hmu3r_88fa9b622f_0c87079573",50.61,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fimport_1788448991114_1p9hmu3r_88fa9b622f_0c87079573.jpg","2026-09-09T18:04:59.118Z","2026-09-09T18:04:59.119Z",{"pagination":240},{"page":195,"pageSize":195},{"data":242,"meta":243},[],{"pagination":244},{"page":195,"pageSize":195},{"data":246,"meta":252},[247],{"id":248,"documentId":249,"slug":250,"title":251},20780,"x68lya7xsp4oqhbhnhosnypa","xining-container-house-unit-prices","Precios unitarios de casas contenedor en Xining",{"pagination":253},{"page":195,"pageSize":195},{"data":255,"meta":388},[256,287,323,358],{"id":248,"documentId":249,"title":251,"slug":250,"excerpt":27,"publishedAt":257,"createdAt":258,"cover":259},"2026-09-13T16:35:13.291Z","2026-09-13T16:35:13.269Z",{"id":260,"documentId":261,"name":262,"alternativeText":263,"caption":27,"focalPoint":27,"width":119,"height":119,"formats":264,"hash":283,"ext":122,"mime":125,"size":284,"url":285,"previewUrl":27,"provider":147,"provider_metadata":27,"createdAt":286,"updatedAt":286,"publishedAt":286},22021,"p03ed0yystyv2nelxabk9x12","import_1788378468007_k79wz9n6_b5269cb90e.jpg","Xining Container House Unit Prices",{"small":265,"medium":271,"thumbnail":277},{"ext":122,"url":266,"hash":267,"mime":125,"name":268,"path":27,"size":269,"width":128,"height":128,"sizeInBytes":270},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b.jpg","small_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b","small_import_1788378468007_k79wz9n6_b5269cb90e.jpg",21.38,21377,{"ext":122,"url":272,"hash":273,"mime":125,"name":274,"path":27,"size":275,"width":135,"height":135,"sizeInBytes":276},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b.jpg","medium_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b","medium_import_1788378468007_k79wz9n6_b5269cb90e.jpg",40.18,40181,{"ext":122,"url":278,"hash":279,"mime":125,"name":280,"path":27,"size":281,"width":142,"height":142,"sizeInBytes":282},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b.jpg","thumbnail_import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b","thumbnail_import_1788378468007_k79wz9n6_b5269cb90e.jpg",3.84,3839,"import_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b",41.59,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fimport_1788378468007_k79wz9n6_b5269cb90e_a2c637a81b.jpg","2026-09-13T16:35:12.857Z",{"id":288,"documentId":289,"title":290,"slug":291,"excerpt":27,"publishedAt":292,"createdAt":293,"cover":294},20772,"sgi5svbf4n4avofe57x6dcsv","Acondicionamiento interior de casas contenedor ignífugas","fireproof-container-house-interior-fit-out","2026-09-13T16:35:06.658Z","2026-09-13T16:35:06.637Z",{"id":295,"documentId":296,"name":297,"alternativeText":298,"caption":27,"focalPoint":27,"width":299,"height":299,"formats":300,"hash":319,"ext":122,"mime":125,"size":320,"url":321,"previewUrl":27,"provider":147,"provider_metadata":27,"createdAt":322,"updatedAt":322,"publishedAt":322},22020,"qhvkmtjb61ibqhdlw5oge14y","import_1788446276172_67a0w9ok_683cef1a13.jpg","Fireproof Container House Interior Fit-Out",960,{"small":301,"medium":307,"thumbnail":313},{"ext":122,"url":302,"hash":303,"mime":125,"name":304,"path":27,"size":305,"width":128,"height":128,"sizeInBytes":306},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9.jpg","small_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9","small_import_1788446276172_67a0w9ok_683cef1a13.jpg",19.19,19190,{"ext":122,"url":308,"hash":309,"mime":125,"name":310,"path":27,"size":311,"width":135,"height":135,"sizeInBytes":312},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9.jpg","medium_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9","medium_import_1788446276172_67a0w9ok_683cef1a13.jpg",34.82,34824,{"ext":122,"url":314,"hash":315,"mime":125,"name":316,"path":27,"size":317,"width":142,"height":142,"sizeInBytes":318},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9.jpg","thumbnail_import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9","thumbnail_import_1788446276172_67a0w9ok_683cef1a13.jpg",3.18,3182,"import_1788446276172_67a0w9ok_683cef1a13_3d152cebf9",45.15,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fimport_1788446276172_67a0w9ok_683cef1a13_3d152cebf9.jpg","2026-09-13T16:35:06.224Z",{"id":324,"documentId":325,"title":326,"slug":327,"excerpt":27,"publishedAt":328,"createdAt":329,"cover":330},20764,"buvs95mkb18kgbkzlmddktyf","Lista de precios de casas contenedor en Zhangye","zhangye-container-house-price-list","2026-09-13T16:35:02.256Z","2026-09-13T16:35:02.234Z",{"id":331,"documentId":332,"name":333,"alternativeText":334,"caption":27,"focalPoint":27,"width":119,"height":119,"formats":335,"hash":354,"ext":122,"mime":125,"size":355,"url":356,"previewUrl":27,"provider":147,"provider_metadata":27,"createdAt":357,"updatedAt":357,"publishedAt":357},22019,"lxxo0iqjlln1xow8mbvtwkyi","import_1788446333146_kwozl0ic_a7dda214a9.jpg","Zhangye Container House Price List",{"small":336,"medium":342,"thumbnail":348},{"ext":122,"url":337,"hash":338,"mime":125,"name":339,"path":27,"size":340,"width":128,"height":128,"sizeInBytes":341},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d.jpg","small_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d","small_import_1788446333146_kwozl0ic_a7dda214a9.jpg",35.26,35264,{"ext":122,"url":343,"hash":344,"mime":125,"name":345,"path":27,"size":346,"width":135,"height":135,"sizeInBytes":347},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fmedium_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d.jpg","medium_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d","medium_import_1788446333146_kwozl0ic_a7dda214a9.jpg",71.12,71116,{"ext":122,"url":349,"hash":350,"mime":125,"name":351,"path":27,"size":352,"width":142,"height":142,"sizeInBytes":353},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d.jpg","thumbnail_import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d","thumbnail_import_1788446333146_kwozl0ic_a7dda214a9.jpg",4.43,4425,"import_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d",75.88,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fimport_1788446333146_kwozl0ic_a7dda214a9_7c6cae683d.jpg","2026-09-13T16:35:01.819Z",{"id":359,"documentId":360,"title":361,"slug":362,"excerpt":27,"publishedAt":363,"createdAt":364,"cover":365},20756,"q6kyv2arqf6ynkz4lzgg52sg","Casas contenedor habitables de Xiqing","xiqing-living-container-houses","2026-09-13T16:34:56.872Z","2026-09-13T16:34:56.850Z",{"id":366,"documentId":367,"name":368,"alternativeText":369,"caption":27,"focalPoint":27,"width":370,"height":370,"formats":371,"hash":384,"ext":122,"mime":125,"size":385,"url":386,"previewUrl":27,"provider":147,"provider_metadata":27,"createdAt":387,"updatedAt":387,"publishedAt":387},22018,"wjbpjnykbddwip672favl1ex","import_1788379355120_hoynh257_73cc5cd035.jpg","Xiqing Living Container Houses",720,{"small":372,"thumbnail":378},{"ext":122,"url":373,"hash":374,"mime":125,"name":375,"path":27,"size":376,"width":128,"height":128,"sizeInBytes":377},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fsmall_import_1788379355120_hoynh257_73cc5cd035_06c80101ee.jpg","small_import_1788379355120_hoynh257_73cc5cd035_06c80101ee","small_import_1788379355120_hoynh257_73cc5cd035.jpg",35.22,35223,{"ext":122,"url":379,"hash":380,"mime":125,"name":381,"path":27,"size":382,"width":142,"height":142,"sizeInBytes":383},"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fthumbnail_import_1788379355120_hoynh257_73cc5cd035_06c80101ee.jpg","thumbnail_import_1788379355120_hoynh257_73cc5cd035_06c80101ee","thumbnail_import_1788379355120_hoynh257_73cc5cd035.jpg",5.77,5766,"import_1788379355120_hoynh257_73cc5cd035_06c80101ee",52.79,"https:\u002F\u002Fcaijing-img.oss-cn-hangzhou.aliyuncs.com\u002Fimport_1788379355120_hoynh257_73cc5cd035_06c80101ee.jpg","2026-09-13T16:34:56.442Z",{"pagination":389},{"page":195,"pageSize":390},4]