Prefabricated Housing in Beijing
There are various types of cement prefabricated housing-related businesses in Beijing, covering different brands, assembly methods, and innovative application scenarios.

Brands and Assembly Methods
In the Beijing market, brands such as Xinwei Hongtu, Huatai Jingye, and Chengyi Cement offer cement prefabricated housing-related services. The main assembly methods include hoisting and panel assembly. Hoisting-type prefabricated houses typically use large lifting equipment to hoist the prefabricated components as a whole to the designated location, suitable for projects with high requirements for structural integrity and relatively open construction sites. Panel-assembly prefabricated houses involve assembling multiple prefabricated components on-site, offering high flexibility and allowing adjustments to the house layout and size according to actual needs.
Innovative Prefabricated Housing System
At the Engineering Consulting and Construction Services Exhibition Zone of the China International Fair for Trade in Services, the E-MIC prefabricated concrete box-type housing system on display has significant advantages. The housing modules of this system are uniquely designed, resembling 'drawers' that can be 'stacked together' to quickly build the main structure of the building, similar to assembling building blocks. Adopting a green and economical design concept, it uses a modular unit interval layout method, reducing module usage by 30% - 40%. This not only increases the usable floor area but also speeds up construction and makes spatial arrangements more flexible. This system is suitable for various construction scenarios such as urban renewal, new residential buildings, and offices, and is currently negotiating cooperation with multiple countries worldwide, holding broad development prospects.
Practical Application Case
Modular integrated construction has been successfully applied to the renovation project of No. 8 Huapichang Hutong, Xicheng District, Beijing, which is a dilapidated building. In this project, the building modules were prefabricated in the factory and then transported to the destination for assembly, similar to assembling Lego blocks. This construction method significantly shortened the construction period, reduced the impact of on-site construction on the surrounding environment, and ensured the consistency and stability of building quality, providing an efficient and high-quality solution for the renovation of dilapidated buildings.




