The connections for prefabricated house walls mainly include the prefabricated partition wall connection with steel connection boxes, the patented connection structure of Jiande (Shenyang) Technology Co., Ltd., and the design and construction of prefabricated cavity wall connections.

Prefabricated partition wall connection with steel connection boxes: Adjacent partition wall panels are connected using steel connection boxes placed within the container slots on the side of the panels. These connection boxes are the primary load-bearing components between seams, capable of resisting shrinkage deformation of the partition walls and classified as rigid connections. The chamber of the connection box consists of left and right reinforcing bars and bolt holes. The bolt holes are used to install tightening bolts that are threaded with bolt sleeves, and the bolt sleeves are welded to the reinforcing bars within the adjacent partition wall panels. The shrinkage stress of the partition walls is primarily borne by pre-stressed anchor bolts. By applying pre-stress in the opposite direction to the cracking stress, these bolts address the increase in grout cracking stress between lightweight partition wall seams, constrain wall deformation, and reduce the grout cracking stress and probability of cracking between seams.

Patented connection structure for prefabricated house walls by Jiande (Shenyang) Technology Co., Ltd.: This structure includes a main wall with a fixed mechanism installed on its wall surface, composed of an L-shaped plate, a secondary wall, threaded rod A, vertical slots, and threaded sleeve A. Threaded rod A is pre-embedded in the wall surfaces of both the main and secondary walls. The L-shaped plate has a set of symmetrical vertical slots on its plate surface, through which threaded rod A passes. Threaded sleeve A, which is threaded onto the rod, presses against the L-shaped plate, achieving a reinforced connection between the main and secondary walls.

Design and construction of prefabricated cavity wall connections: The bottom seam should be set at the floor level, with a seam height of no less than 50mm. The post-poured concrete at the seam should be compactly placed, and the upper surface of the concrete should have a rough surface with a depth of no less than 6mm. At the horizontal seams between upper and lower walls, the vertical reinforcing bars of the edge components should be lapped one by one, with a lap length of no less than 1.6laE, and the center-to-center distance between the connecting reinforcing bars and the connected reinforcing bars should not exceed 4d. For non-edge component areas, circular connecting bars should be used for the connecting reinforcing bars, meeting requirements for lap length, spacing, diameter, etc. When the thickness of the upper and lower prefabricated cavity walls differs, the circular connecting bars need to be bent. Except in specific cases, for standard fortification-class buildings where the thickness of the load-bearing part of the wall is no more than 200mm, single-row reinforcing bar connections can be used for the vertical distribution reinforcing bars of the prefabricated cavity walls, provided that a series of requirements are met, such as the position and spacing of the connecting reinforcing bars, tensile bearing capacity, embedded length, and the configuration of tie bars within the length range of the reinforcing bar connections.