Prefabricated House Villa Process
The process of constructing a prefabricated house villa mainly consists of three stages: preparing building materials and foundation treatment, installing prefabricated components, and subsequent processing.

Preparing Building Materials and Foundation Treatment: First, workers use excavators to clear the residential site, level the soil, and cover the soil surface with polypropylene film to isolate moisture and prevent ground moisture regain. Next, concrete is poured into the foundation pit using a conveying pump to lay a solid foundation for the house. After the concrete dries, bolts are driven into the planned area to secure right-angle brackets. In some cases, bolts are driven into six pile bases separately to prepare for the subsequent installation of prefabricated components.
Installing Prefabricated Components: This stage is a crucial part of the construction. First, prefabricated concrete piers (column piles) are transported and hoisted onto the pile bases using a crane, and connected and fixed with cross-foundation beams to form a stable structure. The foundation beams are poured in advance at the factory, and only need to be tightened with nuts on site, followed by filling gaps with foam glue and sealing bolt holes with cement. The factory prefabricates components such as walls, floor slabs, and roofs using reinforced concrete on an assembly line according to design drawings. During house construction, a crane transports these components to the residential site, where workers precisely assemble them on the foundation like a jigsaw puzzle, secure them with bolts, and apply waterproof glue. For example, in rural areas of Henan, using concrete 'prefabricated houses', cranes and large trucks loaded with reinforced concrete components work together, with a few workers handling the joints, enabling the construction of a two-story villa in just 4 hours.
Subsequent Processing: The previously excavated soil is backfilled into the foundation pit and compacted. The soil surface is covered with polypropylene film again. Rectangular foam boards are neatly stacked and laid out to fill each foundation pit, improving the house's thermal insulation and providing cushioning. Finally, the first-floor ground is poured, although in some cases, due to considerations of house safety, the first-floor ground cannot be completed using prefabricated concrete slabs.