Prefabricated House Partition Wall Installation
Admin 18 de septiembre de 2026
The installation of partition walls in prefabricated houses requires adherence to technical, material, on-site condition preparation, and standardized construction processes. The specific key points are as follows:

I. Pre-construction Preparation
Technical Preparation
- Drawing Review and Coordination: Verify the positioning of partition walls, their connection methods with existing structures, and clarify the locations of reserved openings (doorways, windows, and utility openings) as well as switch and socket positions to avoid conflicts with structural beams and embedded main utility lines.
- Technical Briefing: Clearly communicate to construction personnel the partition wall elevation control lines, node construction methods (such as welding requirements for connectors), and special area handling requirements (e.g., the use of waterproof panels in damp areas).
- Sample Wall Construction: Before large-scale construction, construct a sample wall of over 3 square meters. Only proceed with subsequent construction after the sample wall has passed inspection and workers are familiar with the standards.
Material and Equipment Preparation
- Material Inspection: Check the factory certificates and performance test reports of prefabricated partition wall panels, verify that the model and specifications meet design requirements; ensure there are no through-cracks or large-scale edge and corner defects on the appearance, with dimensional deviations not exceeding 3 millimeters; stack the panels upright on a flat and solid site, with 10-centimeter-high wooden blocks at the bottom for moisture protection, an inclination angle of no less than 70 degrees, a stacking height of no more than two layers, and cover with waterproof cloth for outdoor stacking. Auxiliary materials such as special adhesive mortar and joint filler should be inspected in advance.
- Equipment Preparation: Equip with table-type cutting machines, handheld cutting machines, mortar mixers, etc., check the condition of the equipment, and ensure that electric tools are properly connected with leakage protection.
On-site Condition Preparation
- Confirm that the main structure has passed inspection and acceptance. The ground, ceiling, and side base layers at the partition wall installation site should be leveled, kept clean and flat without floating dust and debris; utility lines such as water and electricity should be laid in advance and marked for direction, leaving space for panel stacking and operation.
II. Construction Process
- Tool and Base Layer Preparation: Check whether the construction environment meets standards and complete the construction of the ground beam (line snapping → reinforcement planting → formwork erection → grouting → full grouting → formwork removal → curing), ensuring that the base layer flatness error does not exceed 3 millimeters.
- Prefabricated Panel Production: Fabricate a mold frame using galvanized square tubes according to the design dimensions, lay a film to prevent concrete adhesion; place a steel reinforcement mesh to enhance structural strength, pour concrete and fill it densely, accurately implant welding parts into the concrete, and remove the mold after the strength meets the standard.
- Prefabricated Panel Installation: Accurately align the embedded parts of the prefabricated wall panels with those of the ground beam, wall surface, and ceiling, and fix them through professional welding processes; or adopt the method of positioning and installing the top and bottom frames and vertical studs before installing the panels. Before installation, remove the protective film and check the quality.
- Structural Treatment: Follow the specifications for process structural treatment, such as filling panel joints with joint filler and pasting anti-crack mesh, to ensure that the design plan meets acceptance requirements.
III. Key Control Standards
- Material Inspection upon Arrival: Waterproof lightweight prefabricated panels must be used in damp areas. Panels with edge and corner defects exceeding the specified value or dimensional deviations exceeding 3 millimeters are prohibited.
- Base Layer Treatment: The flatness of the base layer directly affects the stability of the partition wall. Focus on inspecting and dealing with problems such as hollowing and cracks.
- Special Material Pretreatment: Lightweight prefabricated panels made of ceramsite concrete should be sprayed with water to moisten the surface one day in advance, while gypsum-based panels should be kept dry on the surface.