Prefabricated House Installation Method Video
You can learn the installation methods of prefabricated houses by watching relevant videos, such as 'Installation Process of Single-Story Prefabricated Modular Houses', 'Revealing the Popular New Installation Methods of Modern Prefabricated Assembly Houses', 'Full Process Analysis of Prefabricated Building Installation: From Bay Windows to Balcony Hoisting', and 'Real Footage of Workers Building Prefabricated Assembly Houses'. Detailed information can be obtained from these videos. Here are the key points of the installation methods:

Preliminary Preparation: Before installing a prefabricated house, it is necessary to plan and clean the site to ensure that the ground is flat and solid, meeting the load-bearing requirements of the house foundation. At the same time, prepare the tools and equipment required for installation, such as cranes, slings, wrenches, and electric drills, and inspect the prefabricated components for any damage or deformation to ensure that their quality meets the installation standards.
Foundation Construction: Conduct foundation construction according to the design requirements. Common foundation forms include strip foundations and independent foundations. During construction, strictly follow the measurement and layout for positioning to ensure the accuracy of the foundation's dimensions and elevations. After the foundation is poured, it needs to be cured until its strength meets the design requirements before proceeding with subsequent installation work.
Component Hoisting: Use cranes and other equipment to hoist the prefabricated components one by one to their installation positions. For larger components, such as walls and floor slabs, use dedicated slings and lifting devices to ensure safety during the hoisting process. During hoisting, have a dedicated person in charge of directing and control the lifting, moving, and lowering speeds of the components to avoid collision and damage.
Component Installation and Connection: Accurately position the components hoisted to their installation positions and use tools such as level gauges and plumb lines to ensure the verticality and flatness of the components. Then, connect the components according to the design requirements. Common connection methods include bolt connections and welding connections. During the connection process, ensure that the connections are firm and comply with relevant codes and standards.
Detail Handling and Acceptance: After the components are installed, handle the details, such as filling the gaps between components and installing doors and windows. Finally, conduct a comprehensive acceptance of the entire prefabricated house to check whether its structural safety and functionality meet the design requirements and relevant standards.