Whether prefabricated houses need to be demolished is not determined by a single factor, but requires a comprehensive assessment based on the actual condition of the house, policy planning, and safety appraisal results. The specific analysis is as follows:

1. Design Life and Actual Maintenance Conditions Serve as Basic References The design life of prefabricated panel houses is typically 30 years, but this figure is only a theoretical reference. The actual service life is significantly influenced by the level of maintenance. If the house undergoes regular structural inspections, waterproofing treatments, and pipeline updates, its safe service life may be extended to 40 years or even longer. For example, some well-maintained prefabricated houses can still meet residential safety requirements through measures such as foundation reinforcement and replacement of corroded components. Conversely, if the house lacks maintenance for an extended period, it may develop safety hazards due to material aging, even if it has not reached its design life.

2. Safety Appraisal Results Are the Core Basis for Demolition When structural issues such as wall cracks, roof leaks, door and window deformations, and foundation subsidence exceeding 5 centimeters occur, the housing department should commission a professional agency to conduct a safety appraisal. If the appraisal result is a Grade D dilapidated house (i.e., the overall structural bearing capacity can no longer meet safety requirements), the demolition process must be initiated; if it is Grade C or below, the house can continue to be used through reinforcement and repairs. For example, in a certain location, a house tilted due to foundation subsidence was identified as a Grade D dilapidated house after appraisal, and the local government carried out demolition in accordance with the law.

3. Policy Planning Guidance Influences the Scope of Demolition According to the newly introduced urban renewal policy in 2025, prefabricated panel houses with a service life exceeding 25 years are listed as key observation targets, but the policy does not mandate their demolition. Demolition procedures will only be initiated when the house is included in the urban demolition plan (e.g., due to road expansion, public facility construction, etc.) or is identified as a dilapidated house by a professional agency. For example, an old residential community was included in the demolition scope due to the planned construction of a subway station, and its prefabricated houses, although not meeting the criteria for dilapidated houses, still had to be demolished in accordance with the policy.

4. The Actual Condition of the House Determines the Handling Method If a prefabricated house is structurally sound and free of safety hazards, it is usually only subject to renovation or transformation (such as wall painting, water pipe replacement, circuit upgrades, etc.), and such cases do not involve demolition compensation. For example, some cities have implemented "old community renovation" projects for prefabricated houses, improving the living environment to enhance the value of the houses rather than directly demolishing them.